Determining site area on lot with multiple buidings
Mid-Rise-v4 SSc2:Rainwater managementposted by Phil Vanderloo on
Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.
Project diversion rate v. facility rate
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Deborah Ebersole on
If a project's diversion rate is greater than 75% but the RCI certified facility's diversion rate is less than 75% during project construction is the project still eligable to achieve all MRc2 poin
Number of Products
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hello there, For option 1, how many products would a workstation, with a privacy screen and storage attached be considered?
video conferencing equipment
CI-2009 EAp2:Minimum Energy Performanceposted by Kristen Magnuson on
Our project has several pieces of video conferencing equipment (not just display screens), which are not ENERGY STAR certified.
Over limit adhesive used while building is open
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jayme Antolik on
I am on a project where the contractor used an adhesive that exceeds the VOC limit for that type but the building was open when they used it.
Monitoring Period
Pilot-Credits EApc65:Monitoring based commissioningposted by Mari Hamasaki on
What is the required monitoring period for this credit?
Bicycle Shower Facilities
NC-v4 LTc6:Bicycle facilitiesposted by S. Sachs on
Follow up question to Miles's question about the shower facilities in an adjacent building: I have a similar building that is being built part of a school campus, in which the building adjacent t
Seeking more clarity on active vs, passive storage
NC-2009 PIf3:Occupant and Usage Dataposted by Susan Di Giulio on
We have a campus housing maintenance building with two large storage rooms: they will contain replacement pieces (furniture, carpet etc.) and housekeeping materials for the dormitories.
Exterior Metal Halides
Healthcare-v4 MRp3:PBT source reduction - mercuryposted by Dianne Herrin on
We are working on a V4 BD+C Healthcare Project, and we're completing the Source Reduction Calculator for the M&R Credit PBT Source Reduction-Mercury.
Total Site Areas
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Dave L on
Hi, I am working with a project that is beneath a municipal park.