EBOM MRc4: Reduced Mercury in Lamps - High Rise Residential?

NC-2009 IDc1:Innovation in Design
posted by  Erica Downs  on 

Has anyone had experience submitting this for a high-rise residential project?

0

On site + Off-site restoration

ND-Plan-v4 SLLc8:Restoration of habitat or wetlands and water bodies
posted by  Guillaume Martel  on 

Our project is redevelopping a contaminated site (whole city block), which is part of a larger urban area belonging to the same owner.

1
Thu Jun 23, 2016, 9:53 pm

Confirmation - Durable goods (furniture)

EBOM-v4 MRc1:Purchasing - ongoing
posted by  Stephen Redding  on 

Please just confirm that the purchase of durable goods (furniture) no longer applies to this or any other v4 credit. (Previously v2009 MRc2.1 furniture)

1
Wed Aug 31, 2016, 9:55 pm

Calculating Ds for LEED 62MZCalc

NC-2009 IEQp1:Minimum IAQ Performance
posted by  William Beechinor  on 

Hello, I am currently trying to calculated Ds for the cooling condition for a project I an working on.

1
Thu Nov 5, 2015, 1:42 pm

Golf Course Clubhouse Project Advice

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Johanna Hendricks  on 

Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.

0

Concrete and Asphalt from Demolition

NC-v4 MRc5:Construction and demolition waste management
posted by  James Keohane  on 

What is the best way to include demolition materials such as concrete and asphalt in CWM calculation?

1
Mon May 8, 2017, 4:54 pm

Access to Const credits while under Design Review?

General forums
posted by  Renee Shirey  on 

In this updated format of LEED v3, can you access and upload information into Construction credits while a Design review is going on?

0

Waste Stream Study: Address top 4 only, or any 4 out of the 5?

Retail-NC-v4 MRp1:Storage and collection of recyclables
posted by  Greg Romanczyk  on 

The credit requirement indicates a waste stream study needs to be conducted to identify the project's top five recyclable waste streams.

1
Tue Jan 17, 2017, 10:06 pm

Daily Use of sink in Dorm Lobby

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Todd Bundren  on 

Hello, We are currently responding to initial preliminary advise and getting ready to resubmit our responses for a dorm building.

1
Thu May 25, 2017, 7:00 pm

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

1
Fri May 22, 2015, 1:33 pm