Forum quick links
Water-Related Systems Implementation Phase
CS-v4 IPc1:Integrative processposted by Tyler Young on
I love the introduction of this credit. I have a question regarding the implementation phase of the water-related systems.
Above ground-floor horizontal exterior spaces (plaza, roof)
NC-v4 SSc6:Light pollution reductionposted by Jill Perry, PE on
Forgive me if this was covered elsewhere but I couldn't find it.
Volume Captured on the Stormwater Mgmt Calculator
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Kimberlee Dobbins on
Going from LEED-EB 2.0 SS credit 5.1 to LEED 2009, O&M, what is the number for "Volume Captured"?
Average Leed Recycling percentage for a large ground up building
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Jamie Knoblock on
I was wondering if anyone would know what the average Leed recycling percentage is on a large ground up hospital on a construction site across the united states , thank you.
MR c7 forms
NC-2009 MRc7:Certified Woodposted by Mark Ramsey on
As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.
Lighting Levels
Pilot-Credits EQpc78:Design for active occupantsposted by Henry Richardson on
Hello, We received a review comment requesting lighting level diagrams. Are alternatives acceptable, including drawings showing fixture selection or lamp output? Thanks, Henry
Commingled or Source Separated
NC-2009 MRc2:Construction Waste Managementposted by Risto Beatty on
Could someone please help define the meaning of 'source separated' in terms of the Material Stream credit calculator?
Dorm Room Controls, no mechanical cooling
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Michele Helou on
We have a dormitory project with about 80% individual rooms and 20% double rooms. Each room is provided with a Thermostat and an operable window with over 4% operable window to floor area ratio.
Rainwater Management
Data-Centers-NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project?
Water Quality
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Nathan Anderson on
Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f.