initial cost for lease
CI-2009 EAc3:Measurement and Verificationposted by Monica Hue on
Is there are is an initial fee that must be paid upfront when the tenant signs the lease to pay for energy use? If there is this fee, how much does that typically cost?
Cold Climate
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Erin Holdenried on
Does anybody have experience using an alternate compliance path for a project in a cold climate?
Required to use facility weighted average?
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Eileen Gohr on
"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility." Does this mean that proje
Parking Area Clarification
posted by Kristy O'Hagan on
In the latest Update to LEED Interpretation (LI) 10079 & 10080, the 75% maximum limit on area devoted to vehicle storage & circulation has been removed. As of October 1, 2012: So as not to
New LEED building within existing LEED project site boundary
posted by Krissy Buck Flickinger on
I have a building registered under LEED NCv2009, that is being built entirely within the LEED boundary of a certified LEED NCv2.2 Gold project. Same owner.
Enhanced Refrigerant Mgmt - Refrigerators & Kitchen Equipment
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Theresa Lehman on
Received the design review comments back for EAp3 and EAc4 regarding refrigerants. The comments said, "...all equipment with one half pound or more of refrigerant must be listed in the form.
Example of a populated BPDO calculator fro LEEDv4?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jaspreet Pahwa on
Trying to determine for EPD tab within BPDO calculator, if the bottom-line of Weighted EPD value needs to be 20 or as long as 20 products from 5 manufacturer's are noted, compliance is met? Also h
Batt insulation adhesive
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Kim Lombard on
If an adhesive is used to secure batt insulation, I would think that adhesive also needs to be included in the group 1 section for sealants and adhesives. Is that correct?
How to track benefits of replacing existing conditions
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Lauren Bellamy on
We are working on a project where we will be demolitioning an existing parking lot (asphalt) and existing buildings to build our new project.
Site lighting calculations
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
We have a campus projects with three relatively equal size multi-story buildings. The owner will manage the three buildings separately. Each project will pay for their own utilities.