Furniture components assembled on-site

CI-2009 MRc5:Regional Materials
posted by  Eric Thompson  on 

We have a project where elements of the furniture are coming to the jobsite and being assembled there.

1
Sat Nov 15, 2014, 5:44 pm

Enhance Cx, 10 month review of building operation

NC-2009 EAc3:Enhanced Commissioning
posted by  Laura Howe  on 

Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion?

1
Fri Apr 1, 2016, 1:36 am

dealership building and a detached carwash

LEED Guidance for Campuses and Multiple Buildings
posted by  Art Kamm  on 

The project in question consists of a dealership bldg, a detached carwash, and a fuel storage & generator building (3 separate buildings); do they qualify as multiple buildings or a single buil

1
Sat Jan 16, 2016, 2:22 am

O+M: Retail or ID+C: CI

LEED Rating System Selection
posted by  Yulia Chen  on 

Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.

0

DES Engineering Analyis to Determine Losses Path 2

NC-v4 EAp2:Minimum energy performance
posted by  Ryan Hoffman  on 

The LEED v4 Reference Guide offers three was of determining equipment efficiencies, distribution losses, and distribution pumping energy: Monitored data, engineering analysis, and default values.

0

ID Credit for Radon Mitigation system

NC-2009 IDc1:Innovation in Design
posted by  Tyler Barter  on 

We recently submitted an Innovation in Design credit for the design and installation of a radon mitigation system at a recently completed project.

1
Tue Aug 9, 2016, 2:50 pm

How FINAL is the Appeal?

General forums
posted by  Mary Kay  on 

EAp2 was denied in our final design review. We are going to appeal this by addressing their comments and getting the energy savings above 10%. My question is, IF the appeal is denied, what then?

0

Energy Recovery Bypass

NC-2009 EAp2:Minimum Energy Performance
posted by  Kalyan Nishtala  on 

Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.

0

Solar Tubes in Energy Pro

NC-2009 EAp2:Minimum Energy Performance
posted by  Logan Dorrell  on 

How would we model a solar tube light fixture in Energy Pro Software? We want to get the light thru it, but not the heat.

1
Thu Oct 1, 2015, 4:43 pm
1
Wed Feb 1, 2017, 11:51 pm