Furniture components assembled on-site
CI-2009 MRc5:Regional Materialsposted by Eric Thompson on
We have a project where elements of the furniture are coming to the jobsite and being assembled there.
Enhance Cx, 10 month review of building operation
NC-2009 EAc3:Enhanced Commissioningposted by Laura Howe on
Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion?
dealership building and a detached carwash
posted by Art Kamm on
The project in question consists of a dealership bldg, a detached carwash, and a fuel storage & generator building (3 separate buildings); do they qualify as multiple buildings or a single buil
O+M: Retail or ID+C: CI
posted by Yulia Chen on
Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.
DES Engineering Analyis to Determine Losses Path 2
NC-v4 EAp2:Minimum energy performanceposted by Ryan Hoffman on
The LEED v4 Reference Guide offers three was of determining equipment efficiencies, distribution losses, and distribution pumping energy: Monitored data, engineering analysis, and default values.
ID Credit for Radon Mitigation system
NC-2009 IDc1:Innovation in Designposted by Tyler Barter on
We recently submitted an Innovation in Design credit for the design and installation of a radon mitigation system at a recently completed project.
How FINAL is the Appeal?
posted by Mary Kay on
EAp2 was denied in our final design review. We are going to appeal this by addressing their comments and getting the energy savings above 10%. My question is, IF the appeal is denied, what then?
Energy Recovery Bypass
NC-2009 EAp2:Minimum Energy Performanceposted by Kalyan Nishtala on
Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.
Solar Tubes in Energy Pro
NC-2009 EAp2:Minimum Energy Performanceposted by Logan Dorrell on
How would we model a solar tube light fixture in Energy Pro Software? We want to get the light thru it, but not the heat.
Upload Documentation
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Patrick Stark on
I am doing option 3, approach 1.