If Purchasing Chilled Water from Campus Central Plant...
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Nelina Loiselle on
We have a project that we are modeling as purchased chilled water and steam because it is on a campus that includes a central plant. The campus sells the utilities to the department.
IPM in Place and No Pesticides Used
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Ryan Hoffman on
We are working on a recertification. The vendor says they have not applied any pesticides during the performance period.
Window coating and films
NC-v4 EQc2:Low emitting materialsposted by Edgar Arevalo on
Would window coating and films fall under Interior Paints and Coatings section for this credit, or do they not apply?
Basic resource with many uses...
posted by Kath Williams on
Condensed version of LEED-EB: O&M that has proven to be useful in introducing O&M to potential facilities management clients, those just starting LEED-EBOM, and hopefully, will be a bridge
Medical records room with 7 cubicles.
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
I was wondering in order to comply with this credit, will we have to provide thermal controllability for 50% of the 7 cubicles or can we just consider it a multi-occupant space?
Shared Parking
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by José Solis on
My LEED project will be using a garage that will be designed to serve four buildings.
How much of the area inside the LEED boundary must be included?
NC-2009 WEc1:Water Efficient Landscapingposted by Lawrence Lile on
We have a project where a good part of the non-hardscaped area inside the LEED boundary will be planted in native prairie grasses, with no irrigation.
Trouble finding comparable projects for recycling rates
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Martin Stowell on
I am working on a C&S project and I am trying to figure out the expected volume of recycling for the building.
ID credit Green Cleaning Policy without walk-off mats
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rachel Bannon-Godfrey on
We have a project that is not achieving IEQc5 as walk-off mats conflict with the operational aspects of the building. Can we still apply for an ID credit for a green cleaning policy?
Envelop Commissioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Peter Doo on
The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts