Forum quick links
residential kitchen - spray nozzle
NC-2009 WEc3:Water Use Reductionposted by Erin Holdenried on
Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve?
Air economizer in baseline model
CS-2009 EAc1:Optimize Energy Performanceposted by Jeff Riggs on
If your climate zone does not require air econmizer for baseline systems (90.1 2007, climate zone 4a) are you allowed to model your proposed systems with economizer, per design and not have economi
Advantages of v4 Schools over NC
posted by GBD Architects on
Hi all, We are analyzing a project that is on a higher ed campus but serves pre-K students.
Using EBOM credit as an ID credit for NC 2009 submittal
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Jessica Tyler on
I would like to use this credit as an Innovation and Design credit for a New Construction (NC 2009) submittal.
Miles per gallon
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jennifer Webb on
Hello, We are conducting a survey with government employees and are trying to reduce the survey length as much as possible. Do miles per gallon (mpg) need to be included in the survey or would ma
Existing small HVAC&R units
CI-v4 EAp3:Fundamental refrigerant managementposted by Mercedes Ferreira on
For the Fundamental Refrigerant Management credit under the ID+C rating system, when the requirement says, "Existing small HVAC&R units (defined as containing less than 0.5 pound (225 grams) of
NPDc11: are townhomes single dwelling or multiunit buildings
ND-v2009 NPDc11:Visitability and universal designposted by Megan Shelby on
For NPDc11 Visitability and Universal Design, are townhomes considered single dwelling unit buildings or multiunit buildings?
LEED Boundary on large site multiple buildings - 1 certifiable
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Alexander Clark on
I have a project that is on a 50 acre site that will be all developed. The project will have (7) structures on the site.
Master's Research Survey
NC-2009 MRc2:Construction Waste Managementposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
Exemplary performance documentation
NC-2009 MRc2:Construction Waste Managementposted by Kavita K on
Working on a project which is using NC 2009 version. We have to submit for construction preliminary review, We have achieved 97% const.