Forum quick links
Default Tenant Receptacle Loads
CS-2009 EAp2:Minimum Energy Performanceposted by Mary Kay Gonzalez on
On a C&S healthcare building, we simulated the receptacle load based on CS Appendix 2, Table 1, as the appendix directed.
Commercial Coffee Brewers
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Donald Green on
Under the Energy Star Partner Program there is a listing for Commercial Coffee Brewers V1.0 as of 7/2016 - however when you go to the Find Products there is NO listing for Commercial Coffee Brewers
Option 3 - Measurement
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Ashonta Langdon on
Is the minimum foot candles for CI 10 or 25?
Access to at least 50% of tenant occupant floors
Pilot-Credits EQpc78:Design for active occupantsposted by Christopher Heine on
The credit language states "Buildings must have at least one main stair that enables occupants to travel between the building entrance floor(s), occupant’s own destination floor and common use floo
Development Density on a university campus
CI-2009 SSc2:Development Density and Community Connectivityposted by Rhonda Franklin on
Can you tell me if the number of residents in a university dorm would be equivalent to the number of units to determine development density? Thank you!
LEED user Assembly Calculator for Certified Wood
NC-2009 MRc7:Certified Woodposted by Esther Kohout on
Still confused on FSC certified wood. If we as FSC Certified woodworkers, create an assembly with FSC materials, and non FSC materials, that assembly cannot be claimed as an FSC certified.
Places of Respite as a Schools ID credit?
Schools-2009 IDc1:Innovation in Designposted by on
Has anyone used/documented the LEED for Healthcare SSc9 "Places of Respite" credit as an ID credit in the LEED for Schools rating system?
Site Management-Organic Waste Management
EBOM-v4 SSp1:Site management policyposted by Ileana Delgado on
Manufacturing projects need to consider organic waste management?
new building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Bo Slendak on
We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.
Testing with multiple systems in one space
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nate Steeber on
I've looked deeply into all the comments here, but I can't seem to find an answer - I apologize if this is a repeat, or too simple of a question: My project has many AHUs, in some cases two differ