Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Default Tenant Receptacle Loads

CS-2009 EAp2:Minimum Energy Performance
posted by  Mary Kay Gonzalez  on 

On a C&S healthcare building, we simulated the receptacle load based on CS Appendix 2, Table 1, as the appendix directed.

1
Thu Oct 22, 2015, 7:26 pm

Commercial Coffee Brewers

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Donald Green  on 

Under the Energy Star Partner Program there is a listing for Commercial Coffee Brewers V1.0 as of 7/2016 - however when you go to the Find Products there is NO listing for Commercial Coffee Brewers

1
Tue Feb 14, 2017, 3:34 pm

Option 3 - Measurement

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Ashonta Langdon  on 

Is the minimum foot candles for CI 10 or 25?

1
Thu Oct 2, 2014, 3:31 pm

Access to at least 50% of tenant occupant floors

Pilot-Credits EQpc78:Design for active occupants
posted by  Christopher Heine  on 

The credit language states "Buildings must have at least one main stair that enables occupants to travel between the building entrance floor(s), occupant’s own destination floor and common use floo

0

Development Density on a university campus

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Rhonda Franklin  on 

Can you tell me if the number of residents in a university dorm would be equivalent to the number of units to determine development density? Thank you!

1
Wed Dec 30, 2015, 5:45 pm

LEED user Assembly Calculator for Certified Wood

NC-2009 MRc7:Certified Wood
posted by  Esther Kohout  on 

Still confused on FSC certified wood. If we as FSC Certified woodworkers, create an assembly with FSC materials, and non FSC materials, that assembly cannot be claimed as an FSC certified.

0

Warehouse with office space

EBOM-2009 PIf3:Occupant and Usage Data
posted by  Saul Pichardo, AIA  on 

I am working on a warehouse/distribution project that has approx. 200,000 sf warehouse/ distribution space with a 6,444 sf office that supports the warehouse operations.

0

Minimum Energy Performance Calculator v2009: Lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Mark Lund  on 

I believe there is an error in the Minimum Energy Performance Calculator v2009, dated April 18 2016.

1
Fri Jun 24, 2016, 2:58 pm

Group Approach for EAp2 & EAc1 certification

NC-2009 EAp2:Minimum Energy Performance
posted by  soham babu  on 

The question is related to Group Approach when we input two building details in minimum energy performance calculator, out of two building one of the building will not achieve the energy cost savin

1
Thu Aug 31, 2017, 3:23 pm

Ceramic Tile Reporting on LEED IEQ4.3 Form

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Rachael Vidulich  on 

We have ceramic tile flooring on our project and I understand this is exempt from the testing requirements but do you need to list it on the IEQ4.3 form?

1
Wed Jul 15, 2015, 8:50 pm