U-value and SHGC for Baseline Fenestration in ASHRAE 90.1

NC-2009 EAp2:Minimum Energy Performance
posted by  James Lee  on 

I am reviewing the residential unit's EAp2 for Hawaii. The U-value and SHGC in ASHRAE 90.1, Table 5.5-1. The title of table (the first raw) says "Assembly Max.

1
Thu Jul 16, 2015, 10:55 pm

Do classrooms have individual work stations?

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Helene Lefkowitz  on 

I'm working on a LEEDv3 university building that is pursuing certification for NC instead of Schools.

1
Wed Jan 18, 2017, 6:29 pm

Baseline system selection

NC-2009 EAp2:Minimum Energy Performance
posted by  MKK LEED  on 

I have a building that is roughly 20,000ft2 of office, plus another 13,000ft2 of underground parking that is heated to 50F.

1
Tue Feb 14, 2017, 12:10 am

Credit 3.2 option 2

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Michael Schrantz  on 

To whoever can help me! I am bidding on a two-story building.

1
Tue Sep 30, 2014, 6:41 pm

Building Reuse

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  David Browne  on 

With regard to Credit MRc1.1-Exisitng walls, floors and roof: I have a building which has a fake mansard around its perimeter.

1
Mon Jun 1, 2015, 9:13 pm

LEED project with associated Parking Deck

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Ashley Love  on 

I have a question concerning LEED projects with associated parking decks. If this question has been answered elsewhere, I have not been able to find it, so please point me in the direction!

1
Tue Jan 17, 2017, 6:12 pm

Double trouble with ceilings

Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Cynthia Kaplan  on 

Our school project is retaining nearly all of the original plaster ceilings. We are, however, removing the suspended ceilings that were installed in the 1970's, just below the plaster ceilings.

1
Wed Nov 25, 2015, 2:40 am

Sustainable Purchasing: Durable Goods

NC-2009 IDc1:Innovation in Design
posted by  Joyce Kelly  on 

Working on a Warehouse with (4) vending machines, (2) refrigerators. With 24 hr. loads, these seem like good candidates for requring Energy Star qualified products.

1
Wed Jan 18, 2017, 4:29 pm

No mention of Private offices

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Edgar Arevalo  on 

Can we still include private offices that have occupancy sensor controls. Under the drop down space type menu, it only mentions shared office.

1
Wed Feb 22, 2017, 4:06 pm