Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

How to define affordable housing : rental and for-sale

ND-Plan-v4 NPDc4:Housing types and affordability
posted by  William Gagnon  on 

Hello, How do we define principal, taxes and insurance (PITI) in Step 4.' Compute Maximum Pricing'? Should we get in touch with a bank and ask for mortgages rates?

1
Tue Feb 21, 2017, 11:30 pm

Roof Area Clarification

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Maggie Hogan Skaug  on 

Looking for a clarification on the "Roof Area" definition, in particular, what constitutes an "open covered parking structure".

1
Mon Nov 30, 2015, 11:20 pm

New O & M Starter Kit IN Credits

NC-2009 IDc1:Innovation in Design
posted by  Kristen Callori  on 

Hello- Now that these new O & M Starter Kit IN credits are available, and they require that (2) O&M Prerequisite Plans be implemented (such as Green Cleaning + Integrated Pest Management) i

1
Fri Dec 1, 2017, 12:24 am

"Conditioned Space?" - Free cooling with outside air

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, I am not sure whether to class mechanical rooms which are free cooled by outside air as "conditioned" for the purpose of the baseline (so the baseline would be on system 5 in this example).

1
Mon Dec 22, 2014, 3:40 pm

RCI CORR Information

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  John Danby  on 

I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification.

0

Classification of PVC adhesive and Primer

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Randy Weatherly  on 

I have classified PVC water pipe glue as "PVC Welding Adhesives" and the Purple PVC primer as "Adhesive Primer for Plastic". Is this correct"

1
Mon Jun 27, 2016, 12:56 pm

Compliance for Existing Site Features

Pilot-Credits PC14:Walkable Streets
posted by  Vicki Rybl  on 

I am working on a project where most of the site hardscape is existing. I'm looking for an opinion specifically on two of the requirements for this credit. 7.

0

Showerhead with multiple settings

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  AtSite Inc  on 

To receive all of the WEc2 points available, our project needs to install 1.0 gpm shower heads.

1
Wed Dec 21, 2016, 11:49 pm

Future Pedestrian Access

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Rachel Weber  on 

We have a project that will meet SS2 once pedestrian access is available. Do you know if it is adequate to show the sidewalk is in the county's budget?

1
Fri Nov 27, 2015, 3:32 am

Preproject water bodies

ND-Plan-v4 SLLp3:Wetlands and water body conservation
posted by  Sarah Kearney  on 

Hello, What does 'preproject' really mean? Our project is located near a river. Currently there is one building with docks within 50 ft. of the water.

1
Tue Feb 28, 2017, 5:16 pm