Forum quick links
How to define affordable housing : rental and for-sale
ND-Plan-v4 NPDc4:Housing types and affordabilityposted by William Gagnon on
Hello, How do we define principal, taxes and insurance (PITI) in Step 4.' Compute Maximum Pricing'? Should we get in touch with a bank and ask for mortgages rates?
Roof Area Clarification
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Maggie Hogan Skaug on
Looking for a clarification on the "Roof Area" definition, in particular, what constitutes an "open covered parking structure".
New O & M Starter Kit IN Credits
NC-2009 IDc1:Innovation in Designposted by Kristen Callori on
Hello- Now that these new O & M Starter Kit IN credits are available, and they require that (2) O&M Prerequisite Plans be implemented (such as Green Cleaning + Integrated Pest Management) i
"Conditioned Space?" - Free cooling with outside air
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I am not sure whether to class mechanical rooms which are free cooled by outside air as "conditioned" for the purpose of the baseline (so the baseline would be on system 5 in this example).
RCI CORR Information
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by John Danby on
I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification.
Classification of PVC adhesive and Primer
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Randy Weatherly on
I have classified PVC water pipe glue as "PVC Welding Adhesives" and the Purple PVC primer as "Adhesive Primer for Plastic". Is this correct"
Compliance for Existing Site Features
Pilot-Credits PC14:Walkable Streetsposted by Vicki Rybl on
I am working on a project where most of the site hardscape is existing. I'm looking for an opinion specifically on two of the requirements for this credit. 7.
Showerhead with multiple settings
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by AtSite Inc on
To receive all of the WEc2 points available, our project needs to install 1.0 gpm shower heads.
Future Pedestrian Access
NC-2009 SSc2:Development Density and Community Connectivityposted by Rachel Weber on
We have a project that will meet SS2 once pedestrian access is available. Do you know if it is adequate to show the sidewalk is in the county's budget?
Preproject water bodies
ND-Plan-v4 SLLp3:Wetlands and water body conservationposted by Sarah Kearney on
Hello, What does 'preproject' really mean? Our project is located near a river. Currently there is one building with docks within 50 ft. of the water.