Forum quick links
Excluding demand for occupancy sensors in retail sales area
Retail-CI-v2009 EAc1.2:Optimize energy performance - lighting controlsposted by Eleftherios Zacharakis on
I have a retail store that the sales area is always occupied and therefore not on occupancy sensor. The sales floor is on a time clock instead. The rest of the store is on occupancy sensor.
Successful CIR: Audio Tours as Green Education (Canada)
NC-2009 IDc1:Innovation in Designposted by Jackie Kanyuk on
We've received a successful CIR ruling on our Green Education Audio Tour package, which is a slide show with audio (recorded on site), and an online case study.
Account for local and utility central energy plants
NC-v4 EAp2:Minimum energy performanceposted by S. Sachs on
We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.
Filter Replacement
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Andrew Ellsworth on
BACKGROUND: We have a project that is an office building pursuing LEED-CS 2009 certification. The C&S was substantially complete within the last several weeks.
Single confirmed Tenant - is a binding lease agreement required?
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Alexis Voeltner on
Our client is building a cold dark shell specifically for a tenant (Large grocery store) and the tenant has specified all HVAC, plumbing fixtures, IAQ requirements...
PI Form4 - Lease Requirement
CI-2009 PIf4:Schedule and Overview Documentsposted by Ludmilla Pavlova-Gillham on
My University (12M GSF, 13 divisions, 54 major business units, over 250 major departments), has a multi-use building (287,000) that is undergoing a commercial retail renovation on the ground floor
Master's Research Survey
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.
Products with Zero-VOCs disclosed by MFG
CI-v4 EQc2:Low emitting materialsposted by Stacey Olson on
If the manufacturer provides documentation indicating the product has zero VOCs, does additional documentation showing compliance w/ CDPH Standard Method V1.1-2010 still need to be provided?
2009 BD+C and 2009 CS on Campus site- SSc4.2
posted by Deborah Lucking on
SSc4.2 is listed as a "Campus" credit. However, we have one project that is pursuing Major Renovation, and another pursuing Core & Shell certification.
Multiple Points for One RPC
NC-2009 RPc1:Regional Priorityposted by Suzanne Johnson on
Water efficient landscaping is listed as an RPC in the database for a project. It states "WEc1 I Up to 4 Points".