Church+Classrooms = Office?
EBOM-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.
existing site soils are impervious
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by emily reese moody on
Hello, I am fielding a question for our civil engineer.
Does gravel count?
NC-v4 SSc3:Open spaceposted by Harvard University Green Building Services on
Does gravel count as vegetated open space where there are bushes and other plantings in the gravel area?
Ice Makers on LEED 2009 for Retail NC
Retail-NC-v2009 WEc3:Water use reductionposted by Nic Millard on
Are ice makers included in the WE 3 calculations since its Retail NC, we thought they were excluded for NC all together, but were not sure if this only applied to NC schools and core and shell.
Waste Oil Fuel
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Daly on
I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.
Condenser water
CS-v4 EAc3:Advanced energy meteringposted by MKK LEED on
Hi, We are providing condenser water to the floors of a core and shell building for tenant installed heat pumps throughout.
The envelope data for old building (baseline) are not avaiable
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
Hi, I am modeling campus building under major renovation. But since that building was built in 1968, no envelope data available (no spec.
Public Shuttle to Ferry/Rail
NC-v4 LTc5:Access to quality transitposted by Kristen Magnuson on
I know private shuttles do not count, and the LEED credit language emphasizes walking distance; however, can you count the trips at a ferry station and train station that are accessible through pub
Missing: Design/Construction designation & "ready for review"
posted by Teresa Stern on
Our project was changed over to LOL v4 but there are no designations for Design vs Construction credits.
ECp2 and c1 - Location of this Addendum?
posted by Michelle Bracewell-Musson on
Hello Tristan, My team has had a bit of a challenge trying to find "like" manufacturing buildings that are conditioned.