Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Gym is throwing off IEQ credits!

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Ileana Schinder  on 

We are working on a Recreation Center (Total SF 19,200), the gym is 7,200 and the rest of the building is made up of classrooms and other shared spaces.

1
Tue Feb 21, 2017, 8:59 pm

Golf Course Clubhouse Certification

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Johanna Hendricks  on 

Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.

1
Thu Oct 9, 2014, 4:34 pm

Attempting to return ceiling tiles from demo

CI-2009 MRc2:Construction Waste Management
posted by  Dean Wilson  on 

We are performing a 2009 Commercial Interior for the reuse of a 7000 sq ft decommissioned Army base building. In the demolition phase, we collected old ceiling tiles to return to the manufacturer.

1
Thu Feb 11, 2016, 7:57 pm

Zero Lot Line calc

NC-v4 SSc4:Rainwater management
posted by  Janika McFeely  on 

Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?

1
Tue Apr 21, 2015, 6:03 pm

ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Avery Colter  on 

OK, so a reviewer directed me to the 2011 ASHRAE HVAC Applications Handbook.

0

Major renovation of historic district bldg in historic district

LEED Rating System Selection
posted by  Pamela Smith   on 

Renovating of 1980s renovation of a 3 story office building in a historic district. Basically zero lot line, it has small pooled parking with neighboring buildings.

1
Sat Aug 26, 2017, 7:57 pm

LEED CI Regional Priority Documentation

CI-2009 RPc1:Regional Priority
posted by  Bethany Beers  on 

It's not clear to me where to document the points for RPC's. At the end of each template, there is a check box for ID points, but nothing for RPC points.

1
Tue Mar 15, 2016, 7:53 pm

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

1
Mon Jun 1, 2015, 9:00 pm

SSc4.1 Bus Rapid Station

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Christopher Widdowson  on 

Are there any post criteria or definitions of what constitutes a Bus Rapid Station or Terminal?

1
Thu Sep 8, 2016, 11:42 pm

Modeling HVAC for future un-designed office space

NC-2009 EAp2:Minimum Energy Performance
posted by  Vernon Smith  on 

I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.

1
Fri Dec 9, 2016, 3:38 pm