Forum quick links
Gym is throwing off IEQ credits!
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ileana Schinder on
We are working on a Recreation Center (Total SF 19,200), the gym is 7,200 and the rest of the building is made up of classrooms and other shared spaces.
Golf Course Clubhouse Certification
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Johanna Hendricks on
Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.
Attempting to return ceiling tiles from demo
CI-2009 MRc2:Construction Waste Managementposted by Dean Wilson on
We are performing a 2009 Commercial Interior for the reuse of a 7000 sq ft decommissioned Army base building. In the demolition phase, we collected old ceiling tiles to return to the manufacturer.
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Avery Colter on
OK, so a reviewer directed me to the 2011 ASHRAE HVAC Applications Handbook.
Major renovation of historic district bldg in historic district
posted by Pamela Smith on
Renovating of 1980s renovation of a 3 story office building in a historic district. Basically zero lot line, it has small pooled parking with neighboring buildings.
LEED CI Regional Priority Documentation
CI-2009 RPc1:Regional Priorityposted by Bethany Beers on
It's not clear to me where to document the points for RPC's. At the end of each template, there is a check box for ID points, but nothing for RPC points.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
SSc4.1 Bus Rapid Station
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Christopher Widdowson on
Are there any post criteria or definitions of what constitutes a Bus Rapid Station or Terminal?
Modeling HVAC for future un-designed office space
NC-2009 EAp2:Minimum Energy Performanceposted by Vernon Smith on
I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.