Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Will Sit/Stand desks become standard?

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Ron Finney  on 

Have your clients begun asking for this to become their new standard? I haven't seen this yet but we are starting to use them more and more. frequently.

1
Wed Oct 12, 2016, 8:10 pm

90% controls for open office systems furniture

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Brian VanAllen  on 

As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?

0

ECB vs Appendix G

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  MKK LEED  on 

I am trying to understand whether the modelling for Option 2 of this credit is supposed to be done using the ECB method or Appendix G.

1
Fri Sep 23, 2016, 3:01 pm

green power for residential hi-rise?

NC-2009 EAc6:Green power
posted by  Seonhee Kim  on 

Any proven strategy pursuing green power credit for residential hi-rise project? it is a rental property with separate utility meter to each unit. Any advice would be greatly appreciated!

1
Tue Aug 25, 2015, 1:35 pm

Well Building Standard

CI-2009 IDc1:Innovation in Design
posted by  Susan Coy  on 

I am working on a LEED-CI project and we are doing documenting the project to receive the Well Building Standard certification as well.

1
Fri Dec 16, 2016, 10:24 pm

Steel Extraction Location - Manufacturer Claim

NC-2009 MRc5:Regional Materials
posted by  Sara Zoumbaris  on 

Hi all, I am spinning my wheels second guessing what is now accepted.

1
Fri Jan 16, 2015, 6:55 pm

Documentation for small sites without SWPPP

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Norma Lehman  on 

For the first year of construction, our project site area was smaller than the area that requires SWPPP inspections/reports.

1
Sat Aug 26, 2017, 1:59 pm

Reopening one path of LEED-CI SSc1.2 in Construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Susan Di Giulio  on 

In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.

1
Tue Apr 28, 2015, 2:28 pm

Walk-off Mat Width Requirement

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Itzel Meynard  on 

My project is LEED 2009 commercial interiors. I understand the entryways are required to be 10 feet in the direction of travel inside the building.

1
Wed Oct 5, 2016, 3:07 pm

43" partitions block views and negate compliance?

EBOM-2009 IEQc2.4:Daylight and Views
posted by  Vanessa Seibert  on 

I see that there was some conversation on the views credit back in 2011.

1
Tue Dec 1, 2015, 2:29 pm