IAQ Procedure is NOT acceptable?
CI-2009 IEQp1:Minimum IAQ Performanceposted by James Keohane on
I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.
Existing Building, Renovations Taking Place Piecemeal
CI-v4 EQc4:Indoor air quality assessmentposted by Sara Zoumbaris on
We have a university lab project that is renovating a select number of rooms, with varying materials/ systems being replaced at different times.
Garage Space - Negatively Pressurized Rooms
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Panda Aumpansub on
Hello there, For garage spaces that are designed for CO/NO₂ monitoring and have a neutral (Exhaust air – Supply air = 0) pressurization.
Athletic Track
NC-2009 SSc2:Development Density and Community Connectivityposted by Erica Downs on
Has anyone successfully used an Athletic Track as a "fitness center" option? Definitely open the public and seems like it should fly. Thanks!
PIf2- Project Summary Details
NC-2009 PIf2:Project Summary Detailsposted by Karly Michalowski on
What to do if project owner will not supply project budget?
Rennovation with small addition
NC-2009 EAp2:Minimum Energy Performanceposted by Stephanei Mezynski on
I am working on a project that is 15,00 sqft renovation and 8,000 sqft new construction (addition).
Enhanced Cx - EAc3;
NC-2009 EAc3:Enhanced Commissioningposted by Miles Britz on
Systems Manual; on our Const. Phase submittal the reviewer stated we need to include a Systems Manual. It appears this refers to the Training of staff on the bldg.'s.
Sub-merters
EBOM-v4 EAp2:Minimum energy performanceposted by Ann-Judith Belanger on
Hi, we have a building that share some mechanical equipment with the adjacent building.
Calculations for an Elementary School
Schools-NC-v4 LTc7:Reduced parking footprintposted by Cynthia Kaplan on
We are trying to figure out how to translate our ITE calcs properly for an elementary school project.
University Campus with Solar, not in Project LPB
CI-v4 EAc4:Renewable energy productionposted by Sara Zoumbaris on
Our project is the renovation of an existing university building.