Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

University Campus with Solar, not in Project LPB

CI-v4 EAc4:Renewable energy production
posted by  Sara Zoumbaris  on 

Our project is the renovation of an existing university building.

1
Mon Aug 28, 2017, 2:11 pm

Reuse roof joists But not roof deck

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  C. Anne Brockelman  on 

I am working on a renovation project of a courthouse. We will be reusing the roof joists but will remove all the existing roof deck.

1
Sat Aug 26, 2017, 10:01 pm

Possible Exclusion??

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Nate Steeber  on 

My team has a unique project (I suppose most are) - part of it is a cheese processing facility.

1
Wed May 24, 2017, 1:04 pm

Campus Project

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  P Fanfulik  on 

I have a project consisting of two buildings which was registered as a campus project. When using Portfolio Manager, am I required to benchmark as a campus?

1
Thu Feb 25, 2016, 7:23 pm

Recycling estimates from similar projects

CS-v4 MRp1:Storage and collection of recyclables
posted by  Martin Stowell  on 

Since this is a C&S project, we need estimates for expected volume of recycling. Can you provide any guidance on where to find case studies or historical data or similar buildings?

1
Tue Jan 17, 2017, 9:52 pm

Energy Star minimum area = 5,000sf

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Saul Pichardo, AIA  on 

I would like to certify a two story, 3,800 s.f. office building. When generating the Energy Star performance report one question asks to confirm that the building area is 5,000 s.f. or greater.

1
Tue Apr 7, 2015, 3:59 pm

Pilot Credit 87: Verified C&D Recycling Rates

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  David Dixon  on 

have several project and have had to work with the contractors and their LEED coordinator to select a company that is verified for this credit.

0

Existing Conditions

NC-v4 WEp1:Outdoor water use reduction
posted by  Craig Graber  on 

This is Josef Abboud from Atelier Ten For outdoor areas within a renovation project scope (i.e.

1
Tue Apr 12, 2016, 3:19 pm

Maximum number of ID points allowed

CI-2009 IDc1:Innovation in Design
posted by  javier torres  on 

Hi there, I'm working on LEED NCv2009 project and trying to find out if there is a limit as to how many points can be earned in the ID category. The LEED checklist shows up to 6 points (1.1 thru 1.

1
Tue Sep 15, 2015, 10:30 pm

construction completion date is outside of performance period

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Jessica Hawley  on 

We are currently in our performance period for a project where a tenant fit out of a vacant floor is currently in the planning stages & construction may or may not start during our performance

1
Mon Jan 4, 2016, 9:37 pm