University Campus with Solar, not in Project LPB
CI-v4 EAc4:Renewable energy productionposted by Sara Zoumbaris on
Our project is the renovation of an existing university building.
Reuse roof joists But not roof deck
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by C. Anne Brockelman on
I am working on a renovation project of a courthouse. We will be reusing the roof joists but will remove all the existing roof deck.
Possible Exclusion??
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Nate Steeber on
My team has a unique project (I suppose most are) - part of it is a cheese processing facility.
Campus Project
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by P Fanfulik on
I have a project consisting of two buildings which was registered as a campus project. When using Portfolio Manager, am I required to benchmark as a campus?
Recycling estimates from similar projects
CS-v4 MRp1:Storage and collection of recyclablesposted by Martin Stowell on
Since this is a C&S project, we need estimates for expected volume of recycling. Can you provide any guidance on where to find case studies or historical data or similar buildings?
Energy Star minimum area = 5,000sf
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Saul Pichardo, AIA on
I would like to certify a two story, 3,800 s.f. office building. When generating the Energy Star performance report one question asks to confirm that the building area is 5,000 s.f. or greater.
Pilot Credit 87: Verified C&D Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by David Dixon on
have several project and have had to work with the contractors and their LEED coordinator to select a company that is verified for this credit.
Existing Conditions
NC-v4 WEp1:Outdoor water use reductionposted by Craig Graber on
This is Josef Abboud from Atelier Ten For outdoor areas within a renovation project scope (i.e.
Maximum number of ID points allowed
CI-2009 IDc1:Innovation in Designposted by javier torres on
Hi there, I'm working on LEED NCv2009 project and trying to find out if there is a limit as to how many points can be earned in the ID category. The LEED checklist shows up to 6 points (1.1 thru 1.
construction completion date is outside of performance period
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Jessica Hawley on
We are currently in our performance period for a project where a tenant fit out of a vacant floor is currently in the planning stages & construction may or may not start during our performance