Using VAV box CFMs as measurement of outside airfow
EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoringposted by Sean Blaevoet on
Will GBCI accept monitoring of VAV box CFMs as measurement of outside airflow during "economizer" mode?
Heat pump water heater
CS-v4 EAc6:Enhanced refrigerant managementposted by Ammon Palmer on
We are using a heat pump type water heater. The refrigerant capacity for the unit is over the 0.5 lb threshold.
LEED v4 CI , E&A :AEDG 50% requirements
CI-v4 EAc2:Optimize energy performanceposted by Vinay Shekar on
The tenant space that we are looking to certify for LEED v4 CI is part of an existing building .
WEp1 for Shopping Center
posted by Nate Steeber on
Hello all, We have a shopping center interested in certification with 10 buildings.
Concrete Formwork
CS-2009 MRc5:Regional Materialsposted by Mike Zupan on
Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!
Diverse Uses within a Shopping Center
CS-v4 LTc4:Surrounding density and diverse usesposted by Frank Sherman on
The planned C+S development is a shopping center that will include retail, restaurants, a grocery store and movie theater.
Alternative Compliance Path
Schools-2009 SSp2:Environmental Site Assessmentposted by timothy thomas on
I am working on a project that at the initial project team meetings and scorecard review it was indicated that the Phase 1 ESA had been done and that there were no significant issues.
1-Existing to Remain Parking Space, Reserved for ADA
NC-v4 LTc7:Reduced parking footprintposted by Sara Zoumbaris on
Hello, We have a project that will designate the 1-existing parking space for ADA upon project completion.
Historic Bldg Renovation being done in phases, C&D Waste calcs
NC-2009 MRc2:Construction Waste Managementposted by Debra a. Lombard on
I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.
Parametric Rotation Runs for Baseline model of Existing Building
NC-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
Since the energy model is based off of an existing building.