ASHRAE 90.1 Chilled Beams Compliance
posted by Federico Taboada on
How can I know if a Chilled beam system for ventilation complies with the ASHRAE 90.1 2007 minimum efficiency requirements ? It has not been mentioned in the ASHRAE Standard.
Option 1 Path 2 Mechanical & Electrical Rooms
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Amy Harmon on
I am working on a project that has multiple AHUs serving different types of spaces and we also have several large mechanical and electrical rooms.
Master's Research Survey
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.
Different route numbers on same route
NC-v4 LTc5:Access to quality transitposted by Chad Thurlow on
Hello A couple questions: Do I count the total number of stops in one direction listed by the transit authority?
Customer Use of Restrooms
Retail-CI-v4 WEc1:Indoor water use reductionposted by Donny Goris-Kolb on
Guidance states "If restrooms are not provided for customers within the retail project,.." If the store's restrooms are intended for employee use, but employees are directed to grant customers acce
Document Upload
NC-v4 EQc6:Interior lightingposted by Boggarm Setty on
For V4, is there no requirement anymore to upload supporting documents? I don't see any upload buttons on the form itself.
Use of Hycrete waterproofing admixture for Innovation credit
NC-2009 IDc1:Innovation in Designposted by Donna Juselis on
Our project is a mixed use redevelopment in a flood prone area. The first floor slab-on-grade on the project is located below the design flood elevation.
LEED O&M for building additions
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Steve Gross on
I am in the process of documenting LEED O&M credits for a museum that is building an addition.
Addition To An Existing Certified Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Timothy VanOudenhoven on
I am currently working on a project where an existing certified building will have major renovation to the interior of the existing and an addition added to the existing certified building. There w
LEED Selection - High Rise Residential
posted by Curt Pascoe on
I am working on a unique project. 30 story existing historic building, office.