Rooftop smoking areas?
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Sara Neff on
How is the 25' radius applied when the smoking area is on a rooftop? Do we assume the smoke drifts up or do I need to worry about windows below the smoking area?
R-Value for wall assembly
NC-2009 EAp2:Minimum Energy Performanceposted by Sunil S on
I am working on a residential building, the exterior wall assembly as R-19 fill cavity between studs for an 3.5" depth (wood studs 2x4 16" OC) but in the ASHRAE table A3.4, there is no value menti
Site adjacent to 5 lane highway - with no On-0ff ramp.
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Joyce Kelly on
If the Distribution center is less than 1-mile driving distance of 5 lane, wide shouldered Carlyle turnpike aka Route 11 (center lane = turning lane), does that qualify as a highway for the purpo
v09 Water Use Reduction Additional Guidance available
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by RETIRED on
As part of the October 2016 LEED addenda update (http://www.usgbc.org/articles/leed-addenda-update-october-2016), USGBC updated the Water User Reduction Guidance document to Version 9 (http://www.u
data center equipment not listed in DOE Energy Star categories
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Gail Napell on
Servers are listed on the Energy Star website, but not receivers. Is it safe to assume they are still not Energy Star eligible?
Shower in the adjoining building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Karl Heitman on
The project is a stand-alone office building but it's connected to the existing building to the south by a 70' covered link.
Expansion joints-LEED for schools v2009
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by Stephanie Santiago on
For the expansion joints being used in a LEED project for schools v2009, do they have to meet the NRC requirement of 0.70? Currently our sub wants to use Seismic Colorseal, STC 52/OITC 38.
Airflow testing service
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Saul Pichardo, AIA on
Hi All, We are looking for a company in the San Francisco Bay Area who can conduct the airflow tests in our commercial building (in the office area). We are working on a LEED O&M project.
Street trees in a winter resort
Pilot-Credits PC14:Walkable Streetsposted by John Zehren on
Our project is bounded by a stream on one side, a road on another and 2 sides are on an active pedestrian mall (non motorized) with retail and restaurants meeting the height to width ratio.
Master's Research Survey
Pilot-Credits MRpc61:Material disclosure and assessmentposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati for my Master's thesis in support of my hypothesis.