Historic Bldg Renovation being done in phases, Bldg reuse calcs
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Debra a. Lombard on
I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.
WEc2: Time frame for functional reclaimed water systems
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Brian Bartholomew on
Under the Bird's Eye View here for WEc2, there is a citation of LEED Interpretation #10012 made on 05/09/2011 which states "projects may only count future infrastructure such as reclaimed water sys
MRc5 Material Tracking/Documentation
CS-2009 MRc5:Regional Materialsposted by Maggie Hogan Skaug on
RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.
searching out no voc floor sheathing and mdf
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Phil Vanderloo on
I was hoping someone can direct me to a resource, available to Sacramento Ca., for compliant, (no voc or urea formaldehyde), 1 1/8" T&G plywood floor sheathing. Thank You
Phased Flush Out
Schools-NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.
FSC Wood COC
NC-2009 MRc7:Certified Woodposted by Andy Prestridge on
We have received the FSC invoice for some of our FSC plywood and our subcontractor had it delivered to his shop a few miles away and then brought it to the site.
MRpc69 Attainable in the New Construction Project
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Vanessa Cardona on
This credit was readily attainable for a new residential building located in Manhattan. Six streams were recycled by tracking waste throughout the construction phase of the project.
Views exculsion for High Bay Window areas
Schools-2009 IEQc8.2:Daylight and Views—Viewsposted by David Sundersingh on
We are in the early stages of design for a Career Compact Center, this has 3 workshop areas with high bay windows for natural lighting.
Project has all 5 Categories
Schools-2009 WEc4:Process water use reductionposted by Sara Zoumbaris on
Hi all, My project has all 5 categories installed (dishwasher with racks, pre rinse etc..), however one of the products is above the maximum limit.
Inconsistency between BD+C and O+M
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Adam Stoker on
Despite efforts to better align the rating systems in LEED v4, there are some inconsistencies between the Enhanced Indoor Air Quality Strategies credits in BD+C and O+M.