Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

SSc5.1 or SSc5.2

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Sheryl Swartzle  on 

My project is a Hotel in urban area with almost a zero lot line. The owner purchased fifteen 25 ft.

1
Wed Apr 6, 2016, 6:57 pm

Composting

EBOM-v4 MRc4:Solid waste management - ongoing
posted by  Claire Bannister  on 

Are existing buildings that are not schools still able to get a points for composting food waste? Can it be included in the calculations of ongoing solid waste?

1
Thu Jul 6, 2017, 6:44 pm

Option 3: Determining HC and NOx emissions

EBOM-v4 SSc5:Site management
posted by  Michelle Raigosa  on 

Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?

1
Fri Feb 27, 2015, 4:30 pm

Master's Research Survey

NC-2009 MRc7:Certified Wood
posted by  Vibha Pai  on 

I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.

0

LEED management for multi-prime contractor project

NC-2009 MRc4:Recycled Content
posted by  Chris Gutsche  on 

We have a LEED 2009 institutional project with 12 prime contractors. There is a construction management entity with oversight of the 12 primes.

1
Fri Aug 25, 2017, 6:21 pm

Group projects w/ DES / central plants

CS-2009 EAp2:Minimum Energy Performance
posted by  Stacey Olson  on 

This is with regard to an open air shopping plaza, which is registered as a group project with 7 structures. We received guidance to follow the “Treatment of District or Campus Thermal Energy in

1
Fri Aug 19, 2016, 4:57 pm

Fair Housing Act

Pilot-Credits PC34:Design for Adaptability
posted by  Kenneth O'Brien  on 

Why don't you just list the requirements for Fair Housing? The vague language of the list in the requirements is confusing.

0

Achieving Same Pilot Credit Twice?

Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workers
posted by  Patty Lloyd  on 

Is it acceptable to attempt the same pilot credit on more than one project? For instance, I achieved PC81 on one project. I was wondering if it is acceptable to attempt it on another project?

1
Thu Feb 16, 2017, 1:22 am

Multi-Purpose Latex Primer/Sealer

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Stephanie Santiago  on 

What voc limit would I use for a Multi-Purpose Latex Primer/Sealer paint for use on interior ladders?

1
Sun Oct 5, 2014, 2:09 pm

UCSB - Bren Hall

Pilot-Credits IPpc96:LEED Lab
posted by  Brandon Kaysen  on 

We are very excited to be wrapping up our third LEED Lab project at UCSB. This ear we are certifying the iconic Bren Hall under Version 4 of the EBO&M rating system.

0