Forum quick links
Walk-Off on exterior and interior
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Aaron Levine on
An earlier comment said that, "LEED Interpretation #10098 seems to be saying that, if your entry system is at the exterior &/or less than 10 feet long, you will need to write a darned good just
Must non-potable water sources be used to earn IP credit?
NC-v4 IPc1:Integrative processposted by Eesmyal Santos-Brault on
It appears that this credit can not be earned if a project does not meet some water demand through nonpotable sources.
Extent of Documentation
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by David Browne on
I know from having attempted this credit on other projects that the documentation can be tedious, but I have a current project where it seems ridiculous.
Square Footage for the Decorative Lighting Allowance
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Christopher Shaw on
When you claim a lighting allowance for Decorative appearance you get 1 watt/sf.
LEED GA v4 exam
posted by Monica Pinjani on
Hi Everyone I intent to take the Green GA exam this October. Was initially planning to take the 2009 format exam but due to personal reasons couldn't take it before June 15.
EnergyPro for Whole Building Energy Simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Logan Dorrell on
We have a project in which they are attempting to use EnergyPro to show compliance for credits EAp2 and EAc1.
How to document a non-LEED-certifiable building?
NC-2009 EAp2:Minimum Energy Performanceposted by Anya Fiechtl on
Our project includes a separate non-LEED certifiable building with no regularly occupied space and no FTE, that houses the renewable energy and ground source heat pump systems for the main building
Separate CxA's for Fundamental and Enhanced Cx?
NC-2009 EAc3:Enhanced Commissioningposted by Timothy Casper on
In a traditional design-bid-build project, does the CxA need to be responsible for both fundamental and enhanced Cx? Or can these credits be split between two CxA's?
Residential high rise with school at the base
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Ilana Judah on
We are designing a high-rise residential tower with a school and retail area at the base. There is some entry and service space serving the residential tower on the cellar and ground floor levels.
Commissioning Documents
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Heather Anderson on
What documents are necessary to complete EA Prerequisite 1? So far, I have: 1. Fundamental Commissioning of the Building Energy System (Found on the USGBC website) 2.