Contaminated material in a bulldozer demolition
NC-v4 MRp2:Construction and demolition waste management planningposted by Priscillia Champagne on
Hi LeedUser,
Affordable Housing for Rental Units
ND-Plan-v4 NPDc4:Housing types and affordabilityposted by Amanda Polematidis on
I have a mixed use project in Florida with about ten stories of 1- and 2-bedroom apartments for rent. I want to explore the feasibility of pursuing this credit as a pilot credit.
AEDG table - Reflective Surfaces
CI-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
Since I'm pursuing the prescriptive method of this prerequisite, I am filling out the entire AEDG. For the Daylighting and Lighting section, it asks for interior surface average reflectance i
Data Center LEED Comment for PUE modeling
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi , I submitted a Data center for LEED review in which I assumed that Data center load is operating is 100% at all the times in a year, now LEED is saying that I need to create 3 model one w
Interior Renovations to Historic Building while maintaining historic status
NC-v4 MRc1:Building life-cycle impact reductionposted by Dimuth Kurukulaarachchi on
Would a project still qualify for Option 1 Historic Building Reuse if it has a local historic designation (requiring maintenance of the building exterior components)? Th
Systems requiring metering
CS-v4 EAc3:Advanced energy meteringposted by Tim Nabholz on
Hi All, I am pursuing this credit for a LEED v4 Core and Shell project and am having trouble determining which systems require meters.
Reviewer requires cutsheets
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit. I need to as
Reviewer requires cutsheets
CI-v4 EQc6:Interior lightingposted by Edgar Arevalo on
Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit. I need to as
Glare Control for Regularly Occupied Spaces
NC-v4.1 EQc6:Interior Lightingposted by Lauren Kottis on
"For all regularly occupied spaces, meet one of the following requirements:
PV and Battery
NC-v4.1 EAp2:Minimum Energy Performanceposted by Kristin Hernandez on
I am working on a new construction project in California that required PV and battery per Title 24. Does this need to be accounted for in the energy model?