Relevant Trades/Contractors at Project Planning Stage
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Charles Boechler on
From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key individ
Interior element reuse in different project
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Nadia Azzam on
Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED).
Lighting Control - Recording Studio
CI-v4 EQc6:Interior lightingposted by Edgar Arevalo on
I have a library project that has a recording studio in the basement. After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor. After
Furniture
NC-v4 MRp2:Construction and demolition waste management planningposted by Alexandra Kravel on
We are working on a partial renovation for a college building.
Patient Rooms
Pilot-Credits WEpc147:All-Gender Restroomsposted by Vanessa Hostick on
Does anyone have experience documenting this pilot credit on a hospital? It's unclear if the patient room should be included or excluded from the documentation and count.
Future medical office building - views methodology
CS-v4.1 EQc5:Quality Viewsposted by Jeremy Shiman on
We are pursuing the Quality Views credit on a CS project that was originally going to be the shell for a tech client, but will now be the shell for a MOB.
PCR for Pavement Preservation
NC-v4.1 MRc2:Environmental Product Declarationsposted by Mike March on
I’m working on generating an LCA and EPD for a product I develop and am running into an unexpected hurdle - finding a PCR and Program Operator.
How do I calculate the total runoff, if I am required to send rainwater elsewhere?
EBOM-v4.1 SSc1:Rainwater Managementposted by Rick Fox on
I have so many questions concerning storm water management. My company is a large warehouse. We have 350 truck parking spots as well as 150 employee parking spots and a 525,000 sq
More elaboration on the long-term storage
CI-v4.1 LTc4:Bicycle Facilitiesposted by CRB Sustainability on
We are currently certifying under CI 4.1, and I would like to gain a deeper understanding of the requirements for long-term storage of bikes located outside of the building.
Averaging Facility Rates over Time
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Vanessa Hostick on
The credit guidance notes that to apply rates over time, a project's waste should be the weighted average for the facility over the time in which the project sent materials to the facility.