Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

WA State DES requirements align

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Michelle Bombeck  on 

We are pursuing this credit on any of our WA State projects run by Dept of Enterprise Services as they require prevailing wage and apprenticeship requirements in alignment with the credit.

1
Wed Jul 12, 2023, 3:28 pm

Temperature Sensor

CI-v4 EQc5:Thermal comfort
posted by  Edgar Arevalo  on 

I have a dilemma for a library project i'm working on.  It seems the MEP designer added temperature sensors (wall or ceiling mounted) in the reading areas.  These don't have any way to ad

0

Water metering v4.0 Janitor's closet water usage

CS-v4 WEc4:Water metering
posted by  Alicia Ravetto  on 

Reviewer wrote: "Provide narrative confirming that the janitor's closet water usage has not been addressed within the metering capacity and that at least 80% of the indoor plumbing fixtures and fit

4
Default Avatar
Senior Manager - Sustainable Services
Surmount
LEEDuser Basic Member
29 thumbs up
Mon May 15, 2023, 9:48 pm

Project Size Requirements

Homes-v4 MPR3:Must comply with project size requirements
posted by  LeeAnn Sendra  on 

I am an Architect and doing my first LEED Certification Project for my Firm. I am a bit nervous and embarassed that none of the engineers on this new Home are LEED Acredited.

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Sun May 14, 2023, 6:17 pm

Design stage of the submitted LCA analysis?

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by     on 

I couldn't find any mention of requirements for the design stage of the submitted LCA analysis.

1
Thu May 11, 2023, 7:01 pm

Calculating sf for vegetated landscape

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Marie Miller  on 

Hello - I'm attempting to calculate the amount of sf that need to be vegetated for this credit.

2
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
249 thumbs up
Tue May 9, 2023, 2:58 am

Lighting in unconditioned exterior concourses

NC-2009 EAp2:Minimum Energy Performance
posted by  Judhajit Chakraborty  on 

I am working on a stadium project where the main concourses are exterior and tucked under the seating bowl; within the concourse are restrooms, concessions, etc.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri May 5, 2023, 6:18 pm
3
Thu May 4, 2023, 2:20 pm

Calculations for demountable partitions

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Marie Miller  on 

I'm working on a TI project and we're trying to get the Design for Flexibility point. When calculating for this credit, do we use linear feet or square feet of the product?

0

Job Opening! Manager of High Performance and Sustainable Construction

Help Wanted: LEED-related Jobs
posted by  Susan Heinking  on 

Looking to make a difference on the Construction side of the industry? Come join Pepper Construction!  We are a midwest based GC but build all over the country in mutliple markets.

0