Daylight Study - Approach for partial wall coverings / multiple materials
CI-v4.1 EQc7:Daylightposted by Yarden Harari on
Hi All,
Has anyone come across a project that has multiple treatments on a wall (like an acoustic band), or multiple flooring finishes that are similar in shade / reflectance values?
Low Construction Waste Diversion Rate
NC-v4 MRp2:Construction and demolition waste management planningposted by Jason Cocek on
I have a project located in an area without access to good construction waste recycling services and the best option is to haul waste more than two hours away from the site.
"external" process energy for airports - jet bridges, ground power units, andpreconditioned air units
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hello,
Submitting ASHRAE 90.1-2019 model in lieu of 2016 - LI 10500
NC-v4.1 EAp2:Minimum Energy Performanceposted by Brightworks Sustainability on
Good afternoon,
Table 7.8 DHW performance requirements for electric instantaneous water heater
NC-v4 EAc2:Optimize energy performanceposted by Kent B on
I see there is "Gas Instantaneous Water Heaters" in Table 7.8, but there is not an "Electric Instantaneous Water Heater" in the table. Is the "Electric Water Heaters" term meant to be generic
Piping Insulation
NC-v4 EQc2:Low emitting materialsposted by Megan White on
For new construction projects, the Ref Guide excludes insulation around HVAC ducts from the IEQc2 requirements (p.668).
Demand Response for Residential buildings
NC-v4 EAc4:Demand responseposted by Amanda Cunningham on
Has anyone pursued this credit for a multifamily building? I'm assuming the automated demand response would only apply to common areas under the building management's control.
Can you round percentages on indoor water use reduction?
NC-v4 WEc2:Indoor water use reductionposted by Nate Shroyer on
Hi! Our project is currently meeting 49.95% reduction on indoor water use. Does anyone have any experience about whether it is possible to round this up to 50% for the maximum of 6 poin
EA Credit: Enhanced Commissioning
CI-v4 EAc1:Enhanced commissioningposted by Lawrence Rennell on
What level of testing is actually required for LEED V4 enhanced commissioning envelope testing?