Forum quick links
Building Area Method and Space-by-Space Method for lighting power density
NC-v4.1 EAp2:Minimum Energy Performanceposted by Ying Lindsey on
Dear All,
I have a question regarding lighting power density with the building area method and with the space-by-space method.
Correctional Facility lighting
NC-v4 SSc6:Light pollution reductionposted by Lawrence Rennell on
Government mandated roadway lighting is exempted from light pollution reduction calculations. What about correctional facilities?
Commercial refrigeration systems but not a store
EBOM-v4.1 EAc1:Enhanced Refrigerant Managementposted by Summer Minchew on
I have an O+M project considering Option 2.
CRI Green Label Plus-Low Emitting Materials
posted by Bob Paterson on
Looking to confirm if CRI Green Label Plus remains as eligibility for a point in Low emitting materials strategy for V4.1?
School- Combination Oven (p2 et credit)
Schools-NC-v4 WEp2:Indoor water use reductionposted by Priscillia Champagne on
Hi LeedUser, My supplier specialist asked me 2 questions on Combination Oven :
Open spaces - Turf Grass Calculation
Schools-NC-v4 SSc3:Open spaceposted by Michael J Turner on
Hi There,
Is Turf grass included in the calculations as vegetated open space? We have a school project. It is LEED V4.0 and we are going with V4.1 for this credit.
furniture reused
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Priscillia Champagne on
Hi, for a new school project, the client wants to recuperate a large part of his furniture not integrated to the building to reuse it (like desk). For the raw material supply credit, it is sp
Metal stops for Tiles
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Cecile de Villemeur on
Hello,
Do you think that metallic stops for tiles should be assessed as flooring systems for IEWc4.3 credit ? THanks !
Emergency generator building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Priscillia Champagne on
I am starting a project in which we are building a new addition to an existing hospital which will be approx. 30 000 m2 (considered separate building from existing hospital).