Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Building Area Method and Space-by-Space Method for lighting power density

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Ying Lindsey  on 

Dear All,
I have a question regarding lighting power density with the building area method and with the space-by-space method.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 8, 2022, 5:18 am

Correctional Facility lighting

NC-v4 SSc6:Light pollution reduction
posted by  Lawrence Rennell  on 

Government mandated roadway lighting is exempted from light pollution reduction calculations. What about correctional facilities?

1
Mon Jun 6, 2022, 9:42 pm
1
Fri Sep 23, 2022, 10:21 am

CRI Green Label Plus-Low Emitting Materials

LEED v4.1 Discussion Forum
posted by  Bob Paterson  on 

Looking to confirm if CRI Green Label Plus remains as eligibility for a point in Low emitting materials strategy for V4.1?

3
LEED Consultant
Edgewood Group
LEEDuser Basic Member
0 thumbs up
Fri Jun 3, 2022, 3:30 pm

School- Combination Oven (p2 et credit)

Schools-NC-v4 WEp2:Indoor water use reduction
posted by  Priscillia Champagne  on 

Hi LeedUser, My supplier specialist asked me 2 questions on Combination Oven :

1
Fri Jan 13, 2023, 9:00 pm

Open spaces - Turf Grass Calculation

Schools-NC-v4 SSc3:Open space
posted by  Michael J Turner  on 

Hi There, 

Is Turf grass included in the calculations as vegetated open space? We have a school project. It is LEED V4.0 and we are going with V4.1 for this credit. 

0

furniture reused

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Priscillia Champagne  on 

Hi, for a new school project, the client wants to recuperate a large part of his furniture not integrated to the building to reuse it (like desk).  For the raw material supply credit, it is sp

1
Tue May 31, 2022, 4:06 pm

Metal stops for Tiles

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Cecile de Villemeur  on 

Hello, 

Do you think that metallic stops for tiles should be assessed as flooring systems for IEWc4.3 credit ? THanks !

0

Emergency generator building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Priscillia Champagne  on 

I am starting a project in which we are building a new addition to an existing hospital which will be approx. 30 000 m2 (considered separate building from existing hospital).

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon May 30, 2022, 1:07 pm