LED lamps
EBOM-v4 MRc2:Purchasing - lampsposted by Karim Farah on
The LEED guideline states that “Mercury-free lamps, such as LEDs, can be included in the pictogram per lumen-hour calculations only if their energy efficiency levels are equal to or greater than th
LEED Boundaries & Construction Boundaries
NC-2009 SSp1:Construction Activity Pollution Preventionposted by soha yamani on
ESC Plan and Project LEED Boundary in Campus project we are working on a campus LEED project that have four different contractors working on four different buildings that will be registered for LE
Occupancy Density and Fresh Air Calculation
NC-v4 EAp2:Minimum energy performanceposted by Ahmed Labeeb on
Dear,
100% Previously Developed Site with National trees
NC-v4 SSc2:Site development - protect or restore habitatposted by Ahmed Labeeb on
We are working on a project located in Dubai, UAE. The total site area was previously developed by an old owner.
Non SRI compliant material over Excellent SRI material
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Faisal on
What if a roof slab which is covered with an assembly having excellent SRI(>78) & U V values as per Energy modeling requirement, is covered with an non-compliant material (say grey gra
Dedicated Smoking area for Group Building with distance less than 25 ft
NC-v4 EQp2:Environmental tobacco smoke controlposted by Ashraf Ali Khan Khan on
We are currently working on NC V4 Group buildings. Project is G+2 with total of 100 buildings and distance between the buildings are less than 25 feet.
Meeting ASHRAE 90.1 COP Requirement in Proposed Case Energy Simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Sasha Peters on
We recently received a comment from USGBC LEED that we have to meet ASHRAE 90.1 COP requirement in proposed case energy simulation as well.
Carpark surfaces
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Ekin Caglar Gokbas on
Hi everybody. I have a problem in the project which i am leading the LEED certification. We have parking areas inside of the building basement floor.
EER Clarification for Typical Floors
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi,
LEED ND Plan - Is it a permanent certification
posted by Mahesh M on
We are prospecting a development in the middle-east for LEED ND certification under V4.