Forum quick links
Informal Bus Services
NC-v4 LTc5:Access to quality transitposted by Ben Pratt on
I am working on a project in Beirut where there is a lack of municipal public transit options - thus making it a challenge to target this credit.
International Project Epa CGP
NC-2009 SSp1:Construction Activity Pollution Preventionposted by ESRA OZKONUKSEVER on
Hi Y'all, we re working on a project in Turkey and creating an ESC and a SWPPP plan.
ROCKY SOIL
NC-v4 SSc2:Site development - protect or restore habitatposted by soha yamani on
in case of rocky soil , limestone precisely in desert area , what kind of restoration should be done ?
LEED AP BD+C V4 EXAM in one month!
posted by Moataz Sakkary on
Dear All Please guide me if any other way than studying the USGBC book, as I have to take me Exam by 15 of September???!! And what is exactly the eight tips companion workbook ?
Narrative for Option 2 Contractor confimration
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Saud Abdul Rasheed on
Hi all, We are not going to provide photos for this credit but we have an IAQ plan developed and the contractor has been following it according to the credit requirement.
modeling with air cooled chiller
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
the building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice storage + dive
ventilation flow rate
CI-2009 IEQc2:Increased Ventlilationposted by ilkyaz ceren güçlü on
Hi, We work on a project in Turkey and I have a trouble about calculations on technical areas. Is it subject %30 increase the flow rate in technical areas?
municipality irrigation line
CS-v4 WEc1:Outdoor water use reductionposted by Radwa Amin on
the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled). Does that count as an alternative water sources? Thank you
CSRs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by NESLIHAN AKSOY on
These reports are very wide range ...but the credit is dealing with sources of raw material extraction.....?
DCV In Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by VEL MUTHU on
Hi all, Modelling DCV has been discussed many times in this forum. I gone through and understand quite a bit. I am listing my understanding along with some quires.