Gypsum board recycling resource, Saudi Arabia
NC-2009 MRc2:Construction Waste Managementposted by Shreepad Bandagi on
Wondering if anyone would have a resource for gypsum board recycling anywhere in Saudi Arabia. Thanks!
Concerning Underground Basements
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Omar Elrawy on
Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I
Duct Seal level
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Sarfaraj Khan on
Minimum duct seal level must comply with table 6.4.4.2A- Ashrae 90, i have this in my specification for duct and i think it apply only to G.I Duct, Not to pre insulated duct, please anyone can clar
Number of IAQ samples required ?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Michael Boyle on
Our project consists of (5 townhouse + multipurpose room). This is considered as one building.
EAc1 points using DES Option 1 + A lot of Renewables
NC-2009 EAc1:Optimize Energy Performanceposted by Reniel Barroso on
We have a project opting to get the maximum 19 credit points in EAc1.
WHAT IS DIFFERENCE NFRC 100 AND NFRC 200
NC-2009 EAp2:Minimum Energy Performanceposted by Ramkrishna Kashyap on
ONLY NON-RESIDENCE ALUMINUM FRAME
Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Aly Adel on
Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only).
Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.
OPR for LEED ND
posted by Philippa Cameron on
Looking through the requirements of LEED ND v4 I can only find reference to the OPR in one location - embedded within Appendix 4 as a requirement for GIB prerequisite Minimum Building Energy Perfor
Minimum Indoor Air Quality Performance Calculation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Amal Venugopal on
My Project has one FAHU on roof which is supply treated Fresh air to all AHU"s, And each AHU further supplies the mixture of outdoor air and Recirculated air to various zone via VAV (no reheating,