Forum quick links
Temporary Materials - Formwork
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Christopher Drew on
The materials credits apply to components that are permanently installed in the building.
Campus approach in a gated residential compound or ND?
posted by ABDELHAMID BESHARA on
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.
LEED Development Density and community connectivity
NC-2009 SSc2:Development Density and Community Connectivityposted by Sherrin Pulickal on
What does it mean by double the project density compared with average density within a calculated area? Its the ememplary performance in option 1.
water cooled chilller
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Hi Marcus The building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice sto
LEED EBOM
posted by Srimannarayana NCVK on
Hi, We are working on a project in Dubai. The building is 55% office and 45% hotel.
LEED boundary for a railway station
NC-2009 PIf1:Minimum Program Requirementsposted by Juan Sergio Simborio on
LEED NC 2009 Our project is a major railway station in Qatar.
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.
refrigerant reccovery
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Faisal on
in EAp3 it says that there should be an EPA approved refrigerant recovery technician, is this requirement also for temporary units(like site offices site warehouse etc) or it is only for permanentl
Regularly Occupied Space Area Calculation
NC-2009 PIf3:Occupant and Usage Dataposted by ESRA OZKONUKSEVER on
Dear All, While calculating the squarefootage of the regularly occupied spaces in a project building, do we use the gross or the net area of the spaces? Thank you!
Building footprint
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Febin Mohamed on
We are doing a campus approach for our project.