Forum quick links
Natural Ventilation Loads Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Sefa Sahin on
Dear All, We are working on residential building in Istanbul/Turkey. The building is heated and cooled by radiators and split AC respectively.
Polishing Powder
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Omar Elrawy on
Dear all, I have a polishing powder that is intended to be used for polishing marble surface.
Separate Changing and Shower Rooms
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Tee Howard on
I would like to clarify the LEED V2009 requirement for Showers and Changing Rooms.
Decorative Lighting
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
Dear All, I have three questions: - We are applying for a commercial interior project, we received our final review (after prem. review) I received a new comment that wasn't mentioned in a prem.
credits gained due to implementation hvac load reduction system
NC-2009 IEQc2:Increased Ventilationposted by sam Alfassy on
I am looking to install hvac load reduction system (HLR ), the system functions by recycling the existing indoor AIR and removes CO2 and other indoor air contaminants, resulting in reduction of fre
Concrete as Temp barriers
NC-2009 MRc2:Construction Waste Managementposted by Ahmad Gabir on
Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of purchasi
DEC - EBOM
EBOM-2009 WEc4:Cooling Tower Water Managementposted by babu rajendran on
My project getting chilled water from District energy center which has cooling towers.
Reduced Parking Footprint Calculation
NC-v4 LTc7:Reduced parking footprintposted by Sefa Sahin on
The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?
LEED EBOM Eligibility
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Amgad Khattab on
We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?
Basement That Extends to Plot line
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.