Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.
OPR for LEED ND
posted by Philippa Cameron on
Looking through the requirements of LEED ND v4 I can only find reference to the OPR in one location - embedded within Appendix 4 as a requirement for GIB prerequisite Minimum Building Energy Perfor
Minimum Indoor Air Quality Performance Calculation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Amal Venugopal on
My Project has one FAHU on roof which is supply treated Fresh air to all AHU"s, And each AHU further supplies the mixture of outdoor air and Recirculated air to various zone via VAV (no reheating,
Campus for a gated residential/commercial compound versus ND
posted by ABDELHAMID BESHARA on
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.
Enhance commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Mamdooh Amin on
Do we have to include the contract document between the owner and the CxA?
LEED 2009 IEQc4.2
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Mario S. on
We have received a datasheet for a floor coating that do not state the VOC content.
Exterior lighting for group certification
NC-2009 SSc8:Light Pollution Reductionposted by Mohamed M. Abd Elhameed on
I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance.
P: avarage rainfall event
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by ESRA OZKONUKSEVER on
Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w
CoC number not mentioned on Invoice
NC-2009 MRc7:Certified Woodposted by Deepika Parmar on
Hi, For our project the Invoices donot mention the CoC number.
LEED EBOM Eligibility
EBOM-2009 PIf1:Minimum Program Requirementsposted by Amgad Khattab on
We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?