Polishing Powder
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Omar Elrawy on
Dear all, I have a polishing powder that is intended to be used for polishing marble surface.
Separate Changing and Shower Rooms
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Tee Howard on
I would like to clarify the LEED V2009 requirement for Showers and Changing Rooms.
Decorative Lighting
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
Dear All, I have three questions: - We are applying for a commercial interior project, we received our final review (after prem. review) I received a new comment that wasn't mentioned in a prem.
credits gained due to implementation hvac load reduction system
NC-2009 IEQc2:Increased Ventilationposted by sam Alfassy on
I am looking to install hvac load reduction system (HLR ), the system functions by recycling the existing indoor AIR and removes CO2 and other indoor air contaminants, resulting in reduction of fre
water cooled chillers
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Hi Marcus, I am working on a project in KSA of about 404330ft2.
Technical service building - Healthcare v2009
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Jonathan Landry on
Hello fellow LEED experts, my client is confused on wether or not their services buildings has to be include in the current certification or could be certificated separately.
Core performance guide option
NC-2009 EAp2:Minimum Energy Performanceposted by mohammed alshaikhsalama on
Hi, The project intents to follow option 3 Perspective compliance path Advanced Building Core Performance Guide.
Natural Ventilation Loads Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Sefa Sahin on
Dear All, We are working on residential building in Istanbul/Turkey. The building is heated and cooled by radiators and split AC respectively.
DEC - EBOM
EBOM-2009 WEc4:Cooling Tower Water Managementposted by babu rajendran on
My project getting chilled water from District energy center which has cooling towers.
Reduced Parking Footprint Calculation
NC-v4 LTc7:Reduced parking footprintposted by Sefa Sahin on
The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?