Forum quick links
LEED 2009 IEQc4.2
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Mario S. on
We have received a datasheet for a floor coating that do not state the VOC content.
Exterior lighting for group certification
NC-2009 SSc8:Light Pollution Reductionposted by Mohamed M. Abd Elhameed on
I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance.
P: avarage rainfall event
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by ESRA OZKONUKSEVER on
Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w
CoC number not mentioned on Invoice
NC-2009 MRc7:Certified Woodposted by Deepika Parmar on
Hi, For our project the Invoices donot mention the CoC number.
LEED EBOM Eligibility
EBOM-2009 PIf1:Minimum Program Requirementsposted by Amgad Khattab on
We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?
Campus for a gated residential/commercial compound versus ND
posted by ABDELHAMID BESHARA on
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.
EAc1 Credits Using DES Option 1 + A lot of Renewables
NC-2009 EAp2:Minimum Energy Performanceposted by Reniel Barroso on
We have a project opting to maximize the 19points of EAc1. The project is served by a District Cooling Plant.
Preferred Parking Spaces Allocation
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Mario S. on
Our project is a new shopping mall that includes retail shops, a supermarket, and restaurants. All parking spaces are located in basement floors (basement 1 to 6).
Public use vs Building occupant use
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Dina Ammar on
In a C&S office building, the owner has provided just enough parking spaces in the basement to the building tenants to meet the local zoning minimum requirements.
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.