IEQc6.1 - space type category
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by S. Sachs on
For IEQc6.1-Controlability of Systems-Lighting, Do concourse spaces in a metro station fall into the regularly occupied space category?
Preferred Parking and LEED Interpretation 10202
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Saud Abdul Rasheed on
Hi all, We have received our Final Design Review and the credit has been denied. Now we want to appeal for the credit as the client is willing to provide Low Emitting and Fuel Efficient Vehicles.
EPA TARGET FINDER RATING TOOL FOR A SCHOOL PROJECT IN KSA
Schools-2009 EAp2:Minimum Energy Performanceposted by VEL MUTHU on
Hi, I am currently working on a school project located in KSA. we are about to start the EA P2 and C1.
Submetering - Core & Shell 2009
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Mohammad Haj-Ali on
We're designing an office building that the owner wants to provide flexibility in leasing, such that tenants can rent certain spaces in the floor, whole floors, or the whole building.
Assembly U-value Calculation
NC-2009 EAp2:Minimum Energy Performanceposted by MURAT DOĞRU on
Dear all, I’d like to ask a question about the assembly U-value calculation according to NFRC norms.
ASHRAE 55 Compliance in Dubai
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Annalise Reichert on
I am working on a project in Dubai, the design engineer has performed a psychrometric analysis using 46.0°C (DB) and 29°C (WB) for climatic design cooling conditions.
Fire suppression systems
NC-v4 EAc6:Enhanced refrigerant managementposted by Jody Lee Potvin-Jones on
Hi, Are fire suppression systems and their OPD and GWP addressed by this credit?
Pressure loss calculation
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Yaser Al Sharif on
We are registed for commercial interior rating system , the system installed in our project is vrv system, in order to comply with optimize energy performance EAC1.3 , critical path supply duct pre
School project - Group certification
posted by Maya Karkour on
Hello, we are working on a new K12 school project with 4 separate buildings (2 bldgs for classrooms, 1 administration and 1 sports center).
Occupancy Proof
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Deepika Parmar on
What is the documented proof required to be submitted to USGBC confirming on the Occupancy considered for our project.