PV Solar Panels outside LEED Boundary

NC-2009 EAc2:On-Site Renewable Energy
posted by  Ammar Yahia  on 


A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project"  to offset 22% of annual energy cost.

1
Thu Aug 25, 2022, 12:50 pm

Prefabricated or modular structure Buildings

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  VISHAL JAIN  on 

Hello,

Would like to know more details on how "Prefabricated or modular structure Buildings" can be certified under LEED. 

0

Decorative lighting fixtures

NC-v4.1 EQc6:Interior Lighting
posted by  Ellis John Mandia  on 

Are decorative lighting fixtures such as chandeliers, wall sconces, and table lamps, that are within regularly occupied space included in the requirements to comply with luminance of less than 2,50

1
Tue Aug 9, 2022, 3:50 pm

Are substations registered within a LEED project?

LEED Guidance for Campuses and Multiple Buildings
posted by  Dalia Abdalla  on 

Do we need to register substations within a project as separate buildings (Under Group Approach) ?  If yes, do we have to consider them for analysis under each credit.

1
Sat May 11, 2024, 3:32 pm

Advanced Energy Metering Owner & Tenant spaces

CS-v4 EAc3:Advanced energy metering
posted by  Aishwarya Chengappa  on 

I have a G+6F C&S office building with 2 office spaces in each floor, which will be metered separately as per the local law.

1
Fri Jul 22, 2022, 3:17 pm

LEED OM V4.1 Location problem

EBOM-v4.1 LTp1:Transportation Performance
posted by  Saba Hajizadeh  on 

Hello everyone,

I'm working on a project, the location of this building is Iran, but I couldn't find it on the ARC website. Do you have any suggestions? What should I do?

0
3
Tue May 17, 2022, 1:31 pm

Hospitality Rating

LEED Rating System Selection
posted by  RIMA BOUDABA  on 

Hi 

I have one resort (43000 sqm) in Riyadh- Saudi Arabia, one palace with 81% refusrbishment and 10 new villas around the palace.

0

District cooling chilled water

CS-v4 WEc2:Indoor water use reduction
posted by  Dina El-Sady  on 

If the project is served by a district cooling plant outside LEED project boundary , does the chilled water count as process water and needs to be included in water efficiency calculations?

1
Fri May 13, 2022, 11:32 pm