Forum quick links
Improving thermal comfort for ski center and ice rink
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Chen Jin on
I am dealing with a complex commercial center that contains a ski center and a ice rink, which clearly fall outside of the comfortable zone of ASHRAE 55.
unfinished space simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Hongyun Zhou on
My building has four floors, and 4th flr is left empty for future use.
Is there LEED CS Precertification plaque?
posted by Wangsoo Lee on
Is there LEED CS Precertification plaque?
DCV requirement for high-occupancy areas
CS-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.
Faucet Flowrate at Actual Water Supply Pressure
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Ran Zhang on
Hi all, I have a question in regard to the flowrate of faucet, whether it should be based on the 60psi specified by LEED or local water supply pressure.
Documentation upload to LEED Online
CS-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni
Energy rate of DES Energy simulation
NC-2009 EAc1:Optimize Energy Performanceposted by Renaud Gay on
Hi Guys, I am a energy simulation engineer. Now I have a project which uses the district steam supplied by the local government as heat source.
Landscape Under Covered
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Anthea Ng on
Hello, My project has a open landscaped G/F partially covered by 2/F structure. Shade tolerant plant species shall be adopted at the covered areas.
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
Here is a major renovation project for data center. Only structure reinforcement is required for major renovation.
Option 2, Path 9
CI-2009 SSc1:Site Selectionposted by Pui Nang Benny Au on
My project is in Hong Kong and the host building is using seawater for flushing, (i.e. no potable water is used for sewage conveyance).