Improving thermal comfort for ski center and ice rink

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Chen Jin  on 

I am dealing with a complex commercial center that contains a ski center and a ice rink, which clearly fall outside of the comfortable zone of ASHRAE 55.

0

unfinished space simulation

NC-2009 EAp2:Minimum Energy Performance
posted by  Hongyun Zhou  on 

My building has four floors, and 4th flr is left empty for future use.

1
Wed May 24, 2017, 4:07 pm

Is there LEED CS Precertification plaque?

General forums
posted by  Wangsoo Lee  on 

Is there LEED CS Precertification plaque?

1
Wed Dec 30, 2015, 7:32 pm

DCV requirement for high-occupancy areas

CS-2009 EAp2:Minimum Energy Performance
posted by  Shenhao Li  on 

Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.

1
Tue Apr 5, 2016, 2:48 pm

Faucet Flowrate at Actual Water Supply Pressure

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Ran Zhang  on 

Hi all, I have a question in regard to the flowrate of faucet, whether it should be based on the 60psi specified by LEED or local water supply pressure.

0

Documentation upload to LEED Online

CS-v4 EAc1:Enhanced commissioning
posted by  Erin Rowe  on 

We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni

1
Wed Aug 16, 2017, 12:28 am

Energy rate of DES Energy simulation

NC-2009 EAc1:Optimize Energy Performance
posted by  Renaud Gay  on 

Hi Guys, I am a energy simulation engineer. Now I have a project which uses the district steam supplied by the local government as heat source.

1
Tue Mar 24, 2015, 4:27 pm

Landscape Under Covered

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Anthea Ng  on 

Hello, My project has a open landscaped G/F partially covered by 2/F structure. Shade tolerant plant species shall be adopted at the covered areas.

1
Sat Aug 26, 2017, 9:47 pm

ESC plan for major renovation of data center

NC-v4 SSp1:Construction activity pollution prevention
posted by  sean wang  on 

Here is a major renovation project for data center. Only structure reinforcement is required for major renovation.

1
Fri Jul 31, 2015, 7:07 pm

Option 2, Path 9

CI-2009 SSc1:Site Selection
posted by  Pui Nang Benny Au  on 

My project is in Hong Kong and the host building is using seawater for flushing, (i.e. no potable water is used for sewage conveyance).

1
Sat Aug 26, 2017, 10:45 pm