Certification Timeline for a registered Project
NC-v4 MPR3:Must comply with project size requirementsposted by Radhesh Sarkar on
Project is underconstruction and 60 % completion of gross project work. Now project is registered under LEED v4 BD+C of https://www.leedonline.com/projects.
VOC content requirements for wet-applied products
NC-v4 EQc2:Low emitting materialsposted by CINDY CHAI on
Hi All! Appreciate if someone can help with the following.
Can amenities inside the project building be counted in the Surrounding Density and Diverse Uses credit?
NC-v4 LTc4:Surrounding density and diverse usesposted by Chern Yue Ewe on
As per the subject, my project by nature is a semi-conductor manufacturing plant located in an industrial park with limited amenities located within 800meters of walking distance.
Simulating Electrical System as back up for Solar Hot Water System
NC-2009 EAp2:Minimum Energy Performanceposted by Achelles DSouza on
I am simulating a hotel building. Domestic hot water requirement will be contributed by solar powered calorifier. Electric hot water system will be provided for back up.
Water Use Reduction: Base Building with existing fixtures
CI-v4 WEp1:Indoor water use reductionposted by Scott Edwards on
Hi - We are working on an interior commercial fit out project in a base building that already has all water fixtures installed.
Non-continuous floors
CI-v4 MPR2:Must use reasonable LEED boundariesposted by David Edenburn on
I have seen this question asked but not answered. We have a client who will renovate three floors of an office building; typical CI project. The issue is that they will do floors 7, 17, 18.
Minimum Requirement for Bicycle Facilities Credit
NC-v4 LTc6:Bicycle facilitiesposted by Nuttanee Vongveeranonchai on
Dear All,
Indoor Water Usage Prerequisite Requirements
CI-v4 WEp1:Indoor water use reductionposted by rakesh bhatia on
In the reference guide of LEED ID+C V4, it is mentioned under prerequisite the newly installed plumbing fixtures must be according to the Table 6 flow rates.
need of two excel file to show daylight compliance ?
NC-v4 EQc7:Daylightposted by Alwin Jino on
As per Version 4.1, IEQ Credit-Daylight: Options 2, Illuminance calculations.
Automatic Daylighting Controls for Primary Sidelighted Areas in Core and Shell project
CS-v4 EAp2:Minimum energy performanceposted by Tien Duong on
Dear All,