Forum quick links
Leeds case study
posted by Rudrabir Ghanti on
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica
Mixed-use Building
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Wan Ji Loo on
Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.
Energy Submetering
EBOM-v4 EAc5:Advanced energy meteringposted by VISHESH AGARWAL on
I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.
Lighting Control
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by VISHESH AGARWAL on
I am working on the project where whole building have occupancy sensor. does need to install 50% of the multi occupant space have lighting control by dimmer.
Exhaust Requirement
NC-2009 IEQp1:Minimum IAQ Performanceposted by SAMY Chamy on
I think this credit is for fresh air requirement. Is there any requirement for Exhaust rates, are they need to documented for this credit Our project have store rooms as per local Fire and safety
SS - EM
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.
Painting/coating in tenant space
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Indochine Engineering VN on
Hi, My project is a mixed use building with 2 floor on the top for apartments. building developer design interior fit out in all apartment for lease.
Duct sealing methods
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by John Covello on
Hello, Can alternative methods for duct sealing be used besides plastic wrap? One of our contractors is proposing using foam to seal the end of the duct openings.
CREC purchase
CI-2009 EAc4:Green Powerposted by Harpreet Rooprai on
I am doing a CI project, in which we are attempting credit EAc4 buying doing an Indian purchase of CREC's.
Furniture heights
CI-v4 EQc8:Quality viewsposted by Subramaniam Chandrasekaran on
exactly same as the below mentioned point; for a project, the interior designer wants to know whether they have to go with 1050 mm or 1100 mm of workstation height; this clarification answers; but