Forum quick links
Heat gain originating from hooded equipment in energy modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
I am doing energy simulations for a factory.
Bamboo Flooring to be considered in certified wood calculations
NC-2009 MRc7:Certified Woodposted by ABDUL MUTHALIB MOHAMED on
We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified wood calculations? Please clarify. Thanks in Advance.
Water Efficiency Calculation
NC-2009 WEc3:Water Use Reductionposted by ABDUL MUTHALIB MOHAMED on
Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?
Historic District
NC-v4 LTc3:High priority siteposted by Indochine Engineering VN on
Hi, my project located in an old district where has a lot of old architecture buildings around with tourist.
Leeds case study
posted by Rudrabir Ghanti on
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica
Mixed-use Building
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Wan Ji Loo on
Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.
Energy Submetering
EBOM-v4 EAc5:Advanced energy meteringposted by VISHESH AGARWAL on
I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.
Lighting Control
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by VISHESH AGARWAL on
I am working on the project where whole building have occupancy sensor. does need to install 50% of the multi occupant space have lighting control by dimmer.
Exhaust Requirement
NC-2009 IEQp1:Minimum IAQ Performanceposted by SAMY Chamy on
I think this credit is for fresh air requirement. Is there any requirement for Exhaust rates, are they need to documented for this credit Our project have store rooms as per local Fire and safety
SS - EM
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.