Forum quick links
Actual Operation of Carpool parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Jatuwat Varodompun on
We have a restaurant apply for LEED NC retail, We have the carpool parkings for both customers abd staffs.
Green Product- FSC
EBOM-v4 EQc7:Green cleaning - products and materialsposted by VISHESH AGARWAL on
If toilet roll and Hand roll is FSC Certified then it can take count as sustainable product category in the Janitorial paper Product Category.
Mandatory requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.
Ongoing purchasing and waste policy
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by VISHESH AGARWAL on
Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.
Core and Shell - Retail
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
We are working on a retail mall where each tenant retail space is provided with a chilled water tap off.
Single certification for physically distinct structures
NC-v4 MPR2:Must use reasonable LEED boundariesposted by NAMRATA GUPTA on
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.
Job Specific Environment Analysis
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Yodi Danusastro on
Does anyone has the template of JSEA? I've been ask to create ESC with inclusion of JSEA template. Where an I find this template?
LEED CI 2009 _ MR Cr1.1_Tenant Space- Long Term Commitment
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Kusha Dogra Sehgal on
I am currently working on LEED CI 2009 project.
Preferred Parking both inside and outside LEED boundary
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by sompoche sirichote on
Our project is factory expansion and our client purchase a new land nearby for parking facilities. The local zoning require 110 parking lot so we provide 104 parking lots on a new land outside LEED
Datacentre Requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Priyadarsi Das on
Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.