Datacentre Requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Priyadarsi Das on
Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.
Outdoor Air Delivery Monitoring - Installation of CO2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by SAMY Chamy on
1. CO2 sensors are installed in our project, but not interconnected with fresh air fans. CO2 sensors will only monitor the CO2 levels and raise an alert when the levels are increased.
Private shuttle buses
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Hanh Truong on
Dear all, I would like to use LI ID# 100001163 : "Shuttle buses should provide direct access to transit facilities within 2 miles of the project site, approximately a 5-10 minute drive, and must b
Zone adjust in residential project
CS-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have an apartment building project. In 1 dwelling unit has 1 bedroom 1 living unit and restroom. Do I need to separate between bedroom and living quarter ?
LOW-EMITTING AND FUEL-EFFICIENT VEHICLES All fields
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Magda Aghababyan on
Hi, We are doing core & shell project building structure has ground and 1st level retail shops,2nd to 9th parking 10th to 18th offices and 19th to 20th residential so,there are electrical charg
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAc1:Optimize Energy Performanceposted by Sheena Moses on
Dear all, The case 2 calculator has pointed us towards using Case 2 - Option 1 for our Existing Retail Mall project located outside of the US.
All water reduction through recycling
NC-2009 WEc3:Water Use Reductionposted by Melissa Merryweather on
I'm just curious if anyone has experience not even achieving the basic 20% reduction with the sanitary ware, but then achieving innovation points on both WEc2 and WEc3 (and of course the regional p
Nee of a fire suppression system
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Magda Aghababyan on
Hi all, Currently we are working on a project which does not have a fire suppression system, but is trying to achieve "Enhanced refrigerant management" credit in LEED NC 2009. In the LEED online fo
Acoustic performance
Data-Centers-NC-v4 EQc9:Acoustic performanceposted by neeraj arora on
How to calculate composite STC for a room?
Can I select my building as "Healthcare" in Portfolio Manager?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Amornchai Challcharoenwattana on
My building is a licensed hospital and we are trying to be certified in the category of LEED Existing Building O&M as Healthcare option is not available in LEED V.3.