loading bay inside building footprint
NC-2009 PIf2:Project Summary Detailsposted by Melissa Merryweather on
Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.
Modeling DCV Savings for Proposed Building
CS-2009 IEQp1:Minimum IAQ Performanceposted by Bernard Sagaiyaraj on
To account savings using DCV, we understand that Baseline building ventilation is to be modeled using ASHRAE 62.1 whereas Proposed building ventilation is to modeled as designed. However our Basel
Pharmaceutical Manufacturing factory project
Healthcare-v4 MPR1:Must be in a permanent location on existing landposted by Magda Aghababyan on
Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months.
VAV boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.
BAS
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by VISHESH AGARWAL on
Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit.
V3 project Minimum Indoor Air Quality Performance Pre-requisite.
CI-2009 IEQp1:Minimum IAQ Performanceposted by sajjad Malik on
I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option
HVAC modelling for Tenant Occupied Spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Saumendra Aggrawal on
I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.
Reclaim land for more than 40 years
NC-v4 MPR1:Must be in a permanent location on existing landposted by Michael Wahjudi on
"All LEED projects must be constructed and operated on a permanent location on existing land" from these statement.
All controls provided using customised mobile app
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Yusuf Turab on
We are working on an IT office building that does not have any switches to control lighting.
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).