Forum quick links
Can a Retail CI Project achieve Water Cr if it has no Rest rooms
Retail-CI-v2009 WEc1:Water use reductionposted by Aswin M on
Can a Retail CI 2009 (restaurant) project achieve Water use reduction credit, if there is no Rest room in the (Retail CI) project scope.
CI for Hospital;
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Ajay Kumar on
This project has about 4 public bus stops located within 1/4 mile of walking distance from project entrance.
LEED Platinum
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Muzammal Abbas LEED AP (BD+C) on
We had submitted one of our LEED EBOM V4 project final review and received 72 points. We had accepted the review and received Certified Gold Level.
Modeling pump, fan, COP
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have many chilled water pumps, 1 primary and 3 loop secondary pumps with heat exchangers.
Heat gain originating from hooded equipment in energy modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
I am doing energy simulations for a factory.
Bamboo Flooring to be considered in certified wood calculations
NC-2009 MRc7:Certified Woodposted by ABDUL MUTHALIB MOHAMED on
We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified wood calculations? Please clarify. Thanks in Advance.
Leeds case study
posted by Rudrabir Ghanti on
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica
Mixed-use Building
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Wan Ji Loo on
Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.
Energy Submetering
EBOM-v4 EAc5:Advanced energy meteringposted by VISHESH AGARWAL on
I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.
Lighting Control
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by VISHESH AGARWAL on
I am working on the project where whole building have occupancy sensor. does need to install 50% of the multi occupant space have lighting control by dimmer.