Can a Retail CI Project achieve Water Cr if it has no Rest rooms

Retail-CI-v2009 WEc1:Water use reduction
posted by  Aswin M  on 

Can a Retail CI 2009 (restaurant) project achieve Water use reduction credit, if there is no Rest room in the (Retail CI) project scope.

1
Sat Aug 26, 2017, 11:50 pm

CI for Hospital;

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Ajay Kumar  on 

This project has about 4 public bus stops located within 1/4 mile of walking distance from project entrance.

1
Fri Nov 18, 2016, 4:35 pm

LEED Platinum

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Muzammal Abbas LEED AP (BD+C)  on 

We had submitted one of our LEED EBOM V4 project final review and received 72 points. We had accepted the review and received Certified Gold Level.

1
Fri Feb 3, 2017, 10:08 am

Modeling pump, fan, COP

CS-2009 EAp2:Minimum Energy Performance
posted by  Indochine Engineering VN  on 

Hi, I have many chilled water pumps, 1 primary and 3 loop secondary pumps with heat exchangers.

1
Tue Oct 7, 2014, 1:20 pm
1
Wed Dec 17, 2014, 3:15 pm

Bamboo Flooring to be considered in certified wood calculations

NC-2009 MRc7:Certified Wood
posted by  ABDUL MUTHALIB MOHAMED  on 

We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified wood calculations? Please clarify. Thanks in Advance.

1
Tue Jan 17, 2017, 11:52 pm

Leeds case study

General forums
posted by  Rudrabir Ghanti  on 

Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica

0

Mixed-use Building

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Wan Ji Loo  on 

Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.

1
Mon Nov 30, 2015, 10:34 pm

Energy Submetering

EBOM-v4 EAc5:Advanced energy metering
posted by  VISHESH AGARWAL  on 

I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.

1
Wed Oct 5, 2016, 9:28 pm

Lighting Control

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  VISHESH AGARWAL  on 

I am working on the project where whole building have occupancy sensor. does need to install 50% of the multi occupant space have lighting control by dimmer.

1
Thu Oct 6, 2016, 4:23 pm