Mandatory requirements

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.

1
Fri Sep 25, 2015, 2:56 pm

Ongoing purchasing and waste policy

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  VISHESH AGARWAL  on 

Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.

1
Fri Oct 21, 2016, 10:29 pm

Lighting control for Meeting room

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Thanh Le  on 

If a meeting room is designed with occupany sensor and manual override, does it comply with this credit. If it does not comply, how do we do to comply with this credit.

1
Tue Jan 10, 2017, 8:15 pm
1
Sat Aug 26, 2017, 6:50 pm

Onsite solar PV generation - 10 years contract

EBOM-v4 EAc7:Renewable energy and carbon offsets
posted by  Ameet AA  on 

Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?

1
Tue Jun 27, 2017, 1:17 am

Basic Doubts

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.

1
Tue Apr 19, 2016, 2:57 pm

Elevated buggy paths qand bridges for resort projecct

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  John Covello  on 

Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.

1
Mon Jul 17, 2017, 9:10 am

Natural ventilation for residential

CS-2009 IEQp1:Minimum IAQ Performance
posted by  mai elly  on 

HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.

1
Thu Dec 10, 2015, 3:01 pm

Required parking lots and LEED boundary Calculations

CS-2009 MPR3:Must use a reasonable site boundary
posted by  kerry wang  on 

Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking

0

Actual Operation of Carpool parking

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Jatuwat Varodompun  on 

We have a restaurant apply for LEED NC retail, We have the carpool parkings for both customers abd staffs.

1
Fri Nov 27, 2015, 4:48 am