Forum quick links
Lighting control in Tenant space
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE.
Tile finishes for flat roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Magda Aghababyan on
We are working project C&S the client need to use white colour ceramic tile on roof top.Should need to test it ? and value has to be more than 78 for the flat roof ?
Blind
CI-v4 EQc5:Thermal comfortposted by Ameet AA on
Hi, Can blind be considered as control for thermal comfort? Thanks.
District Co generation Plantby
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.
Storm water calculation
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Magda Aghababyan on
Hi, We are working in project previously land was empty top soil is hard and when calculating Pre-development
100% outdoor air indirec evaporative cooling system
NC-2009 EAp2:Minimum Energy Performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Project size extended in the middle of construction
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.
Alternative HVAC duct sealant
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by John Covello on
Hi, My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight.
Venlilation Spaces Only
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- Our project have ventilation spaces only (No A/c spaces) so how we model these building in energy model As per LEED Missing manual we follow below things "Assign HVAC systems as per Ap
LEED-GA as a student
posted by PRATIK KUMAR on
Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i