Double- Counting of Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Bharath Ravuru on
Hi, We are going with solar panels on site at our facility. Can I use the renewable energy generated for both on-site renewable energy production credit and also energy savings in the simulation?
Cleaning Chemicals
Hospitality-EBOM-v4 EQc7:Green cleaning - products and materialsposted by VISHESH AGARWAL on
Is laundary and kitchen cleaning chemicals included in LEED V4.
Thermal Comfort - ACP for Projects in India
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Gopinath Vasu on
Dear All, Kindly clarify the following query regarding Thermal Comfort Design Alternative Compliance Path for projects in India. In ACP it is said that projects shall meet the desired comfort con
Motorbike, motocycle & Scooter parking count towards SS CR 4.4?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by John Covello on
Hello everyone, I see in earlier posts that it is unclear if motorbike, scooters & motorcycles parking counts towards this credit's total or not.
Calculating Average Density: Residential Areas or Neighborhood
CI-2009 SSc2:Development Density and Community Connectivityposted by Ajay Kumar on
For Option 2: Community Connectivity. # Is located within 1/2-mile of a residential area or neighborhood with an average density of 10 units per acre net. Please clarify on how to calculate the a
Green pavers
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by jesmin joseph on
Can green/grass pavers comply towards maximum open space credit? Can we consider 25% percentage of grass paver area as vegetated area and other 75% as pedestrian oriented hardscape area? Please a
EA Cr 1.5
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by balasubramaniam kg on
We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas.
link goes to the main USGBC home page
Pilot-Credits PC14:Walkable Streetsposted by Melissa Merryweather on
Hi, I am registered for this Pilot Credit.
Permanent Land /Space Requirement (MPRPp2)
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by al-emran hossain on
Hi LEED Expert , We want to know about Minimum Program Requirement (MPRPp2)of permanent space/land matter. Our client has 20 years lease land from BD Gov and build NC factory as a LEED Project .
Water Efficiency Calculation
NC-2009 WEc2:Innovative Wastewater Technologiesposted by ABDUL MUTHALIB MOHAMED on
Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?