Forum quick links
LEED V3 Vs V4
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by VISHESH AGARWAL on
Advanced energy metering: if a project have all end use submeter but no have enery reporting software or BAS.
Changed awarded credit to attempted
posted by Prudhvi Mahadev on
I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?
CORE area and SHELL area
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Yodi Danusastro on
How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel.
Energy Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi everyone, I am doing energy modeling for my project in Pakistan and i want to need some clarification and help from seniors: 1) Is it true that for baseline and proposed case HVAC system shoul
Lighting control in Tenant space
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE.
LEED EBOM EA c.4
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Fabio Frescia on
Hello, I have a LEED EBOM project in Thailand. I am now dealing with EA c.4 - On site or Off site Renewable Energy.
Fan power in conditioned space
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Hello, My production line space in our project have an supply fan, exhaust fan and make-up fan to supply OA in conditioned space.
Innovation Credit for Employee Wellness
NC-2009 IDc1:Innovation in Designposted by sriram tetali on
Hi, Can anyone has guidelines or suggest for attempting of Innovation in Design credit for Employee Wellness Can it be achieved? or suggest any other alternative. Regards SRIRAM
Confidential space
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Ameet AA on
Hi, The project is a 3-storey high building, single tenant. The tenant already occupies the building, and going to renovate about half of the floor area.
Green Cleaning
NC-2009 IDc1:Innovation in Designposted by Stella Stella on
Hi, We are trying to document Green cleaning towards 1 point under Innovation for our LEED NC project.Is it sufficient to just follow the EBOM requirement for IEQ P3 & 3.1 to document complianc