Forum quick links
Project that only Greenfield Exist
NC-v4 SSc2:Site development - protect or restore habitatposted by Yodi Danusastro on
HI, what if at the project site is only Greenfield?
Tenant agreement to exclude PFP boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
In our project location, it is clear that no tenants will go for a heating system. The base building is also designed for cooling only.
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Sheena Moses on
Dear all, We have a retail mall in Malaysia targeting LEED EBOM v2009 rating.
SHGC Value ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello everyone, Are the maximum SHGC values in ASHRAE 90.1-2007 suggested only? For example on table 5.5-1 there is a max SHGC listed of 0.25.
Vertical Garden/Green wall
CS-2009 WEc1:Water Efficient Landscapingposted by Carmelito Tatlonghari on
I have a project that is considering installing green wall/vertical garden. We would like to pursue WEc1. Water Efficient Landscaping, Option 2 (No Potable Water Use on Irrigation).
Lighting control in Tenant space
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE.
LEED EBOM EA c.4
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Fabio Frescia on
Hello, I have a LEED EBOM project in Thailand. I am now dealing with EA c.4 - On site or Off site Renewable Energy.
Fan power in conditioned space
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Hello, My production line space in our project have an supply fan, exhaust fan and make-up fan to supply OA in conditioned space.
District Co generation Plantby
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.
Storm water calculation
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Magda Aghababyan on
Hi, We are working in project previously land was empty top soil is hard and when calculating Pre-development