Pharmaceutical Manufacturing factory project
Healthcare-v4 MPR1:Must be in a permanent location on existing landposted by Magda Aghababyan on
Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months.
VAV boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.
BAS
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by VISHESH AGARWAL on
Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit.
V3 project Minimum Indoor Air Quality Performance Pre-requisite.
CI-2009 IEQp1:Minimum IAQ Performanceposted by sajjad Malik on
I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option
HVAC modelling for Tenant Occupied Spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Saumendra Aggrawal on
I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.
Open space definition
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by sompoche sirichote on
My project is in the industrial area which allows building footprint not exceeding 66% of total site area.
Can I omit the IP credit since it is stand alone?
NC-v4 IPc1:Integrative processposted by wachira sosaeng on
Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).
Regularly Occupied Spaces
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Muzammal Abbas LEED AP (BD+C) on
I am working on a core and shell project and i want to clarify my below mentioned points for V3 & V4 from seniors.Thanks 1) In core and shell project for daylight do we need to add all regular
Table PIf3-1 Space Usage Type - Owned vs Leased
NC-2009 PIf3:Occupant and Usage Dataposted by Terrapin BrightGreen on
Hi could you confirm whether the "Owned/Leased" column is meant to reflect the project owner's usage management versus the building owner's usage?