Green pavers
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by jesmin joseph on
Can green/grass pavers comply towards maximum open space credit? Can we consider 25% percentage of grass paver area as vegetated area and other 75% as pedestrian oriented hardscape area? Please a
EA Cr 1.5
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by balasubramaniam kg on
We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas.
link goes to the main USGBC home page
Pilot-Credits PC14:Walkable Streetsposted by Melissa Merryweather on
Hi, I am registered for this Pilot Credit.
Permanent Land /Space Requirement (MPRPp2)
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by al-emran hossain on
Hi LEED Expert , We want to know about Minimum Program Requirement (MPRPp2)of permanent space/land matter. Our client has 20 years lease land from BD Gov and build NC factory as a LEED Project .
Water Efficiency Calculation
NC-2009 WEc2:Innovative Wastewater Technologiesposted by ABDUL MUTHALIB MOHAMED on
Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?
Energy Modeling for Support buildings
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- Recently we submit the factory building to LEED as Individual project certification not for group certification.
office building
Retail-NC-v4 WEc4:Water meteringposted by Zahid Ahmed on
recently appointed as FM in commercial office building. what to do if we want to go for LEED certification. need details. thank you
Energy modeling for LEED BD+C: Core & Shell
NC-v4 EAp2:Minimum energy performanceposted by Hanh Truong on
Dear all, We have a project targeting LEED BD+C: Core & Shell. My question is how to model whole-building energy simulation?
Exterior lighting design
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Sivarajah Ragulakeethan on
Hi, We are working on commercial interior projects. While doing the model we didn't receive exterior lighting design.
Co-processing as an approach to Waste Management
CS-2009 MRc2:Construction Waste Managementposted by Katherine Ann Resurreccion on
Hi All, I would like to hear your opinion about co-processing as an acceptable waste diversion to meet the intent of this credit.