LEED CS 2009 - WEp1 & WEc3
CS-2009 WEp1:Water Use Reductionposted by Ruel Galve on
We are building a mixed use project, Office, Hotel and Residential to qualify for LEED CS 2009 Gold. Only the office core will have toilets that will be built during C & S construction.
Open Plan office served by 4 AHUs
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Wahjudi on
Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices.
EBOM V4- IPM
Hospitality-EBOM-v4 EQc9:Integrated pest managementposted by VISHESH AGARWAL on
For Pursing the option-1. In house IPM Policy: is it mandatory to use the SF Tier-III Pesticide or use government approved pesticide.
Probability distribution of annual PV production.
NC-2009 EAc2:On-Site Renewable Energyposted by Indochine Engineering VN on
Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.
100% outdoor air indirect evaporative cooling system
NC-2009 EAp2:Minimum Energy Performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Exterior windows and doors?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Erin Holdenried on
I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1?
office building
Retail-NC-v4 WEc4:Water meteringposted by Zahid Ahmed on
recently appointed as FM in commercial office building. what to do if we want to go for LEED certification. need details. thank you
Energy modeling for LEED BD+C: Core & Shell
NC-v4 EAp2:Minimum energy performanceposted by Hanh Truong on
Dear all, We have a project targeting LEED BD+C: Core & Shell. My question is how to model whole-building energy simulation?
Exterior lighting design
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Sivarajah Ragulakeethan on
Hi, We are working on commercial interior projects. While doing the model we didn't receive exterior lighting design.
Co-processing as an approach to Waste Management
CS-2009 MRc2:Construction Waste Managementposted by Katherine Ann Resurreccion on
Hi All, I would like to hear your opinion about co-processing as an acceptable waste diversion to meet the intent of this credit.