Forum quick links
Conditions for site fence
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Julian Bork on
Hello everybody I have a question about the construction fence as a part of the ESC plan: is there a minimum height for closing or covering the fence with tarpaulins to avoid wind erosion? Many th
Radius
NC-v4 LTc4:Surrounding density and diverse usesposted by Sylvia Renes on
Hi, How does a 1/4 mile radius around the project site from the project boundary looks like?
CS appendix 1: default occupancy counts
NC-2009 PIf3:Occupant and Usage Dataposted by Bernadette Stauder-Buschlinger on
The project is a restaurant within a high rise office building. My question is: What is the correct gross square feet per FTE OR EMPLOYEE.
Number of sampling location
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Caroline PIN on
Dear all, Does anyone know if there is an ACP rule for sampling points for the air quality tests.
Coffee Room Fixture Flow Rate?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ian McCall on
Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
Development Density Calculations
CS-2009 SSc2:Development Density and Community Connectivityposted by Amanda Johnson on
For the Development Density calculations our project has an 880 ft DD radius .
Elevator lobbies -with airlocks?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.
Erosion and Sedimentation Control - Log
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Nicole Isk on
Hi, i got the follwoing comment from the review team on SSc3, and this is the first time i got this comment. Maybe, anyone can help me, what exactly they want me to do.
Circulation space around the building core
CS-v4 EQc4:Daylightposted by Julien Richard on
For Core&Shell projects, the reference guide specifies : “Assume that the entire floor plate, except for the core, will be regularly occupied space “.
Bus shuttle Service to previous location
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Doreen Kruschina on
We have a project in Gallin, a small town with almost no public transport facilities.