NC-v4 EQc5:Thermal comfortposted by Anaïs P on
Hello, I am working on trying to obtain the indoor environmental quality-thermal comfort credit for a new construction. The building contains new open-office workstations.
Tenant Area Modeling
CS-v4 EAp2:Minimum energy performanceposted by Aaron Luthien on
Hello all, We have a C&S office project where the owner prepares technical infrastructure for VRF heating cooling system in tenant area.
Operable windows in lieu of controls - what about WOCDs
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by Andreas Hintz on
For determing the openable wall area (which has to be a minimum of 4% of the net occupiable floor area) should WOCDs (Window Opening Control Devices) be considered?
EAp2:Table 1.4 based on ASHRAE 90.1-2010
CS-v4 EAp2:Minimum energy performanceposted by CHRISTOPHE MATHIEU on
Hi all, I have a project CS LEED v4 and I couldn't found a table 1.4 with the new 90.1-2010 Standard on the LEED website. I have read that I can present the table 1.4 based on 90.1-2007 standard
Confirmation - perforated sticker sign
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Ian McCall on
Hello, Can someone confirm that an temporary (3 months) publicity perforated window decal installed by the future tenant on the glazed facade is out of the scope of the LEED NC or CS certification
Rainfall Rates in Inches
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Ian McCall on
Dear LEEDers, Can someone confirm that a rainfall of 1 inch per 24 hours is 1 inch per 1 inch squared of ground surface? Thank-you, Ian
CSI MasterFormat necessary in Europe
NC-2009 MRc5:Regional Materialsposted by Paul Deinhofer on
Hello Is it also necessary for projects in Europe to evaluate the material costs using the CSI MasterFormat? Or is there another possibility...? Thanks
Solar Panels
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Amanda Johnson on
Hello, We have a project with Thermal solar panels for hotwater, and I just want to double-check that they can be deducted from the roof-surface for this credit since most of the documents (and pos
District Cooling
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Mark Daub on
We have a MR V3.0 project that uses district cooling. First I thought this was great, as no refrigerants are used in the building. Now the district energy guidelines say, that we have to provide al
Plastic Sheeting to Protect Raised Technical Floor
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Ian McCall on
Hello, The installation contractors state that on previous LEED projects they have placed down plastic sheeting down in order to protect the raised technical floor.